What Virginia Is Spending, What Virginia Is Getting: The Commonwealth Data Center Reference
Plain-English summary
This statewide reference weighs what Virginia spends on data centers against what it gets. Its central finding: the sales tax break on data center equipment was worth about $1.9 billion in state and local tax to the industry in fiscal year 2025, by the operators' own reports.
The report finds a substantial share of the industry's investment would come anyway, though Virginia does not yet have the data to say precisely how much. A typical facility may have about 50 full-time workers, about half contractors.
The budget signed June 30, 2026, kept the break and added a temporary tax on data center electricity. The report says that leaves the break's necessity unanswered and recommends ending or sharply narrowing it.
A July 2026 Department of Environmental Quality study simulated a large data center's groundwater demand at nine locations east of I-95. All nine failed.
Summary of version 5.5, November 2026. The full report carries the record behind each point.
Locality pages: City of Fredericksburg · Loudoun County · City of Manassas · City of Virginia Beach. Each shows how a data center gets approved there and what else is on the record.
Full abstract
What Virginia Is Spending, What Virginia Is Getting is the comprehensive statewide reference on data center development in Virginia and the anchor volume for a series of county case studies. It is current through July 25, 2026.
The report finds that Virginia's data center sales and use tax exemption (Code of Virginia § 58.1-609.3(18)) was worth $1,941,390,000 in state and local tax to the industry in FY2025, by the operators' own reports to the Department of Taxation and the Virginia Economic Development Partnership; that the available but-for evidence, from JLARC's December 2024 study, a University of Georgia econometric model, and the broader incentives literature, consistently indicates a substantial share of Virginia's data center investment would occur without the exemption; and that data center load growth exposes residential ratepayers to infrastructure costs that Dominion Energy's own filings project will raise monthly residential bills by 60 to 94 percent by 2035. Data centers already consume approximately 25 percent of Virginia's electricity, a figure published by the Electric Power Research Institute and corroborated by Dominion Energy Virginia's audited annual filings, which report data centers at 28 percent of Virginia Power's electricity sales in 2025.
On June 30, 2026 the Commonwealth preserved the sales tax exemption and enacted a first-in-the-nation tax on data center electricity consumption ($0.011 per kilowatt-hour, capped near $600 million a year, expiring June 30, 2028). In July 2026, DEQ's SJ 25 groundwater study, released six months past its statutory deadline, found the coastal plain aquifer system east of I-95 has virtually no capacity for new significant withdrawals: nine simulated hyperscale-scale withdrawals all failed permitting, with a best case of 360,000 gallons per day far from any development corridor and ceilings below 30,000 at two western test points near the I-95 corridor. Section 14A covers the study and its twelve legislative recommendations, including a proposed comprehensive-plan mandate that would write groundwater availability into local land-use law; the companion volume The Aquifer Says No (10.5281/zenodo.21556435) reads the study at length.
The report assembles the complete state policy record — the exemption statute, the jurisdiction-by-jurisdiction equipment-tax rate landscape, the 2026 data center bills, the State Corporation Commission's new GS-5 large-load rate class, and the Dominion integrated resource planning dockets — plus a full facility inventory of 286 records, a register of canceled and rejected projects (including the Prince William Digital Gateway and Dulles Cloud South), the key-operator list, the state study library, and the companion county volumes.