Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.
Data centers in the City of Manassas, Virginia
What the public record holds for this locality: how a data center gets approved, who is building, and what to read.
Approval Who is building What to read
How a data center gets approved here
A data center is allowed by right in I-1 and I-2. City Council adopted the rule unanimously on its consent agenda on Feb. 23, 2026 (Ord. O-2026-455). An August 2025 draft would have required a special use permit; it was loosened to by right in committee.
The register records "Warehousing and Distribution" in I-1, I-2 and I-A as the fallback category before 2026. The route before 2026 is not established. The online city code is codified through Ord. O-2025-933 of July 28, 2025. Its list of adopted ordinances not yet codified includes O-2026-455 and O-2026-1094, adopted Sept. 14, 2026, a technical amendment whose packet text has no data center term.
- State site assessment
- Not triggered on at least one route. A data center can be approved here, in at least one district or set of parcels, with no rezoning, special exception or special use permit. Other routes in the same locality may require one.
The register entry this is drawn from, in the dataset's own shorthand
- Position
- BY RIGHT
- Where
- I-1, I-2
- What the ordinance calls the use
- Data center
- Provision
- §130-42 def; §130-241 Tbl 2
- If the use is not listed
- Not read
- Adopted
- Ord. O-2026-455 (ZTA 2026-0001), adopted 2-23-2026 on consent agenda, unanimous (Council minutes)
- Changes and status
- Aug 2025 draft would have required SUP; loosened to by right in committee. Pre-2026 fallback was 'Warehousing and Distribution' in I-1,I-2,I-A
- Route before the change
- not established
- Date of the change
- 2026-02-23
- Confidence in this reading
- High. Ordinance text read directly, citation verified, the position unambiguous.
- Source as read
- Municode version Dec 4, 2025, 'Codified through Ordinance No. O-2025-933, adopted July 28, 2025. (Supp. No. 24)'; the adopted-not-codified list (read 11-15-2026) includes O-2026-455, adopted 2-23-2026, and O-2026-1094, adopted 9-14-2026 (technical amendments; its packet text carries no data center term). Read Nov. 4, 2026.
By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.
Who is building here: the public record
4 data center sites in the permit record for the City of Manassas, grouped by site only where the records themselves link them, so one campus can appear as more than one site.
Data center sites found in the free state and federal records searched for the City of Manassas, and utility filings placed in the same locality, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.
AMAZON DATA SERVICES INC - IAD-104/105/106 1 record
- Air permit VA0000005168374240 · AMAZON DATA SERVICES INC - IAD-104/105/106
DIGITAL REALTY 1 record
- Air permit VA0000005168300003 · DIGITAL REALTY
Zumot Data Center 1 record
- Construction stormwater permit VAR10T287 · Zumot Data Center · Clark Construction Group, LLC
IAD 130 PURPLE LINE 1 record
- Stormwater coverage, EPA record VAR10O781 · IAD 130 PURPLE LINE · MetroDuct Systems of VA LLC
Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.
What to read
- Case study: Prince William County case study. The county's data center decisions and the litigation over the Digital Gateway.
- Report: Who Showed Up. A census of the organizations around data center siting in Virginia, 2014 to 2026.
- Statewide report: What Virginia Is Spending, What Virginia Is Getting. The statewide reference on data center development in Virginia.
- Report: Governing the Demand Shock. Virginia hosts the largest concentration of data centers in the world, and between roughly 2018 and 2026 the industry moved out of its Northern Virginia core into more than two dozen counties and independent cities.
- Book: Governing the Demand Shock. A comparison of how Virginia localities handled the arrival of data centers.
- Report: A Line Drawn on a Highway. A study of Virginia's groundwater and river withdrawal rules and the data center water use they do not reach.
This page covers only what these sources contain. A locality with little here may still have data center activity.