Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.
Data centers in the City of Fredericksburg, Virginia
What the public record holds for this locality: how a data center gets approved, who is building, and what to read.
Case study: Fredericksburg Ring, read from local packets, minutes, ordinances and agreements.
Approval Who is building What to read
How a data center gets approved here
A data center of 10,000 square feet or more is allowed by right inside the city's 250-acre Technology Overlay District. It is also allowed by right in I-2 if it does not use water-based cooling, and needs a special use permit there if it does. It needs a special use permit in C-T, C-D, C-SC, C-H, CM, I-1, PD-C, PD-MU and PD-MC and is prohibited in the residential districts and PD-R. A Small Data Center, under 10,000 square feet, is allowed by right in all ten of those nonresidential districts.
City Council adopted the overlay in Ord. 25-02, 7-0 on first reading on Feb. 25, 2025 and 7-0 on second reading on March 11, 2025, over a 4-3 recommendation of denial from its own Planning Commission. A campus in the overlay needs at least 150 contiguous acres. The 250 acres was not measured from the City map. Before March 11, 2025 a data center was by right or by special use permit depending on the district; the form of that rule is not established. The use table's history line lists Ord. 18-16 of Oct. 23, 2018, which was not read.
The I-2 reading rests on a codifier's Editor's Note, and the ordinance behind the note was not identified or read. Whether any I-2 land lies outside the overlay was not mapped. An amendment to § 72-34.9 and other sections (UDOTA FY27-01) was adopted as Ord. 26-11, with seven ayes and no nays on first reading on Sept. 8, 2026 and six ayes and no nays on second reading on Sept. 22, 2026, according to Council minutes. The staff report describes the § 72-34.9 change as a site assessment, including a sound profile, required before the Planning Commission hearing on a rezoning, special exception or special use permit application. The pages read do not show the by-right list in § 72-34.9 amended, and the ordinance text itself was not read.
- State site assessment
- Not triggered on at least one route. A data center can be approved here, in at least one district or set of parcels, with no rezoning, special exception or special use permit. Other routes in the same locality may require one.
The register entry this is drawn from, in the dataset's own shorthand
- Position
- BY RIGHT in I-2 without water-based cooling (SUP with it) and inside TOD; SUP in C-T, C-D, C-SC, C-H, CM, I-1, PD-C, PD-MU, PD-MC; prohibited in R districts and PD-R. Small Data Center (under 10,000 sq ft) by right in all ten of those nonresidential districts
- Where
- I-2 (P/S); Technology Overlay District (250 ac, not measured from the City map; campus minimum 150 contiguous acres, § 72-34.9 B(1)); S in C-T, C-D, C-SC, C-H, CM, I-1, PD-C, PD-MU, PD-MC
- What the ordinance calls the use
- Data Center (10,000 sq ft or more); Small Data Center (under 10,000 sq ft), P
- Provision
- § 72-40.2 Use Table; § 72-41.2E; § 72-84.0; § 72-34.9 (Ord. 25-02)
- If the use is not listed
- Not read
- Adopted
- Ord. 25-02: first read 7-0, 2-25-2025; second read approved 7-0, 3-11-2025 (TOD text, data center provisions, map). Use table history line lists Ord. No. 18-16, 10-23-2018 (ordinance not read)
- Changes and status
- Adopted over its own PC's denial recommendation 4-3. The I-2 by-right cell rests on a codifier's Editor's Note ('Permitted by right for a use that does not incorporate a water-based cooling system and permitted by special use permit for a use that does incorporate a water-based cooling system'); the ordinance behind the note was not read, and whether I-2 land lies outside the TOD was not mapped. eCode360's history line on § 72-34.9 misprints the ordinance as 25-01 of 1-28-2025; Ord. 25-01 repealed the Railroad Station Overlay District. UDOTA FY27-01 (amending § 72-34.9, § 72-43.3, § 72-41, § 72-42, § 72-53.3 and § 72-84), initiated 7-14-2026 (Res. 26-40) and recommended by the PC 8-12-2026, was adopted as Ord. 26-11: first read 9-8-2026 (Ayes 7, Nays 0), second read on the consent agenda 9-22-2026 (Ayes 6, Nays 0), per Council minutes. The 9-22-2026 staff report describes the § 72-34.9 change as a site assessment, including a sound profile, required before the PC hearing on a rezoning, special exception or special use permit application; the pages read do not show the § 72-34.9 C by-right list amended; the ordinance text itself was not read and is not yet on eCode360
- Route before the change
- by right or SUP by district (form before 3-11-2025 not established)
- Date of the change
- 2025-03-11
- Still to read
- The ordinance behind the I-2 Editor's Note on water-based cooling (not identified or read)
- Confidence in this reading
- Medium. The position is established but one element is unresolved: the adopting ordinance, the scope, how current the text is, or the type of source.
- Source as read
- eCode360 'Code 2026-03-24'; 'There are currently no known new laws for this Code.'. Read Nov. 4, 2026.
By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.
Who is building here: the public record
No data center site appears for the City of Fredericksburg in the free state and federal records searched. The records below are placed in this locality but name no data center site, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.
City-wide records
Filings that name no site, state grants, and State Corporation Commission cases placed in this locality.
- SCC case PUR-2026-00194 · Virginia Electric and Power Company - For Approval and Certification of Electric Transmission Facilities: Elmont - Fredericksburg Rebuild Project · VIRGINIA ELECTRIC AND POWER
- SCC case PUR-2024-00035 · Virginia Electric and Power Company - For Approval and Certification of Electric Transmission Facilities: Fredericksburg-Aquia Harbour Lines #29, #2104, and #2157 Partial Rebuild · VIRGINIA ELECTRIC AND POWER CO
Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.
What to read
- Case study: Fredericksburg Ring. Between 2022 and June 12, 2026, the five jurisdictions surrounding the Rappahannock River fall line (Spotsylvania, Stafford, Caroline, and King George counties, and the independent City of…
- Report: Who Showed Up. A census of the organizations around data center siting in Virginia, 2014 to 2026.
- Report: A Line Drawn on a Highway. A study of Virginia's groundwater and river withdrawal rules and the data center water use they do not reach.
- Book: Governing the Demand Shock. A comparison of how Virginia localities handled the arrival of data centers.
- Report: Governing the Demand Shock. Virginia hosts the largest concentration of data centers in the world, and between roughly 2018 and 2026 the industry moved out of its Northern Virginia core into more than two dozen counties and independent cities.
- Report: The Aquifer Says No. In July 2026 the Virginia Department of Environmental Quality published its study of the groundwater supply east of Interstate 95, ordered by the 2024 General Assembly under Senate Joint Resolution No.
- Statewide report: What Virginia Is Spending, What Virginia Is Getting. The statewide reference on data center development in Virginia.
This page covers only what these sources contain. A locality with little here may still have data center activity.