Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.

Portrait of Tommy N. Turner
Data Center LedgerFilings, minutes, orders and transcripts, logged as they are readLatest, Nov. 25: new report version →

All works · Virginia data center series — statewide and analytical volumes

Built for Someone Else: Generation, Load, and the Exception in Virginia

Plain-English summary

This report maps four routes by which generation reaches Virginia's data centers. Under a 2020 law, the State Corporation Commission may approve a new utility-owned fossil plant only if the utility has met energy savings goals or the Commission finds a threat to reliability or security.

For six months that rule governed one plant: Dominion Energy Virginia's 944-megawatt Chesterfield gas plant, approved November 25, 2025, on a reliability finding. On May 7, 2026, Dominion announced a 3,000-megawatt plant in Cumberland County.

Three other routes skip the rule: plants not owned by rate-regulated utilities; a gas plant serving a Sterling data center, which needed no state certificate because it makes power for its owner's own use; and thousands of permitted diesel and gas generators that never reach the Commission. Public process on those three ranges from partial to none.

Summary of version 1.1, October 2026. The full report carries the record behind each point.

Locality pages: Bath County · Cumberland County · Fluvanna County. Each shows how a data center gets approved there and what else is on the record.

Full abstract

Virginia has a statute governing the construction of electric generating facilities. Four kinds of generation now serve the Commonwealth's data centers. The statute reaches two of them, applies its full test to one, and does not reach the other two at all.

This report documents the four routes and the scrutiny each attracts. A utility-owned plant built under the Virginia Clean Economy Act's reliability exception drew 1,923 written comments, 83 witnesses, four days of hearing and 338 docket filings; six months after it was approved the same utility announced a second plant at three times the size, which had no docket at all when the Commission's case index was searched on 10 September 2026. A merchant plant of comparable size is reviewed under a two-prong test: in both merchant cases on the docket the Commission recites the statute with the public convenience and necessity finding elided, because the statute conditions that prong on the applicant being a rate-regulated utility. A 132-megawatt gas plant behind a data center's meter required no certificate at all and has been running since April 2024. And roughly eight thousand permitted diesel and gas generators — a fleet whose aggregate nameplate exceeds any power station in the state — never reach the State Corporation Commission under any docket number.

The report also documents what the demand actually is. Dominion Energy Virginia holds 16,913 megawatts of data center capacity under firm contract and is studying a further 30,132 megawatts at an earlier stage — 47,045 megawatts in total, of which roughly a third is committed. Eighty-eight percent of the last year's growth in that headline figure sits in the least-committed tier. In February 2026 the Federal Energy Regulatory Commission denied four American Electric Power utilities permission to sell 750 megawatts of capacity they had bought for large loads that did not arrive, observing that the problem was "simply that AEP finds itself with excess capacity … because of its own business decisions."

The evidence snapshot is built on 108 primary documents: filings, orders, statutes, permits and datasets, each listed in the data deposit's source manifest. Items dated after the snapshot cite documents read through 24 October 2026, which are not part of that deposit. Every claim carries an evidence grade; where a claim rests on secondary sources or on the author's reading, it says so, and where the record does not reach a conclusion it shows the search that stopped.

Disclosure: The author serves on the advisory board of an Alfred P. Sloan Foundation-funded study at Emory University on data centers and the Southern energy buildout. The study had no role in this report.

Version 1.1 (October 2026) supersedes version 1.0. Corrections and updates for the items dated in the text, through October 24, 2026. Cite all versions: 10.5281/zenodo.22096613.

Companion volume to the Commonwealth Data Center Reference (concept 20679292). Source manifest deposited separately as concept 22099427.

Cite this work

BibTeX
@misc{turner2026builtforsomeoneelsegener,
  author = {Turner, Tommy N.},
  title = {Built for Someone Else: Generation, Load, and the Exception in Virginia},
  year = {2026},
  publisher = {Zenodo},
  version = {1.1},
  doi = {10.5281/zenodo.22096613},
  url = {https://doi.org/10.5281/zenodo.22096613}
}
APA
Turner, T. N. (2026). Built for Someone Else: Generation, Load, and the Exception in Virginia (Version 1.1). Zenodo. https://doi.org/10.5281/zenodo.22096613
Chicago
Turner, Tommy N. 2026. “Built for Someone Else: Generation, Load, and the Exception in Virginia.” Version 1.1. Zenodo. https://doi.org/10.5281/zenodo.22096613.