Case Study: Culpeper County — The Quiet Successor
Plain-English summary
On September 2, 2025, Culpeper County's supervisors unanimously required a special permit for data centers on industrial land countywide, exempting the technology zone and its five approved projects.
The report finds Culpeper's quiet was a product of design. In that zone, data centers on land already zoned for industry were allowed by right, meaning without a public hearing. Outside the zone, where a vote was required, Culpeper fought like everywhere else, including a 4-3 approval and a lawsuit over Amazon's Stevensburg campus.
The Town of Culpeper, a separate government with its own electric utility, let Dominion serve the two campuses in town, won a guaranteed minimum payment from their developer, STACK, and adopted rules effectively prohibiting new data centers.
In 2026 the fight moved to power lines: the supervisors voted to oppose a regional transmission line and a substation proposed for Richardsville.
Summary of version 1.1, October 2026. The full report carries the record behind each point.
Locality page: Culpeper County, with how a data center gets approved there and what else is on the record.
Full abstract
Culpeper County holds one of the largest accumulations of data center entitlements in Virginia's diffusion ring: roughly 11 million square feet built or approved on the nine sites this report inventories (press counts run from 10 to 13 million), and 2,435 megawatts of delivery-point requests by Dominion's own May 2026 count. It assembled that inventory without a Digital Gateway, a Mountain Road, or a marquee lawsuit that anyone outside the county can name. This report asks whether the quiet is real, bought, or simply early, and answers: none of those, exactly. The quiet is an artifact of institutional design. Beginning in 2021 the county consolidated five scattered technology zones into a single incentive district along McDevitt Drive, 690 acres by a June 2024 trade-press account and 950 acres on the county's own economic development page in 2026, a corridor that had hosted secure data infrastructure since the Federal Reserve buried its currency reserve in Mount Pony, and made data centers a by-right use there. By-right development needs no rezoning and no hearing, so it generates no visible politics. Of the five campuses that filled the zone (CloudHQ, DataBank, the Peterson-assembled campus now owned by STACK, EdgeCore, Red Ace), two, CloudHQ and DataBank, went to no vote of their own (an adjacent 100-acre parcel that may be or adjoin CloudHQ's ground was rezoned unanimously) and three passed rezoning votes, unanimous, 5-2 and 4-3, without an organized opposition campaign in the sources read for this report. Outside the zone, where the industry needed a discretionary vote, Culpeper fought like everywhere else: a 4-3 board vote and a citizen lawsuit over Amazon's Stevensburg rezoning in 2022, a developer twice run out of Brandy Station, a veterans' fight at the gates of the National Cemetery. The report documents the design, the approvals, the two-government structure that let an incorporated town with its own water, sewer, and electric utilities monetize the buildout while declining its load, and the tightening that began once the zone filled: a unanimous 2025 ordinance ending by-right use outside the zone, a town ordinance effectively prohibiting new data centers inside it, a board election that replaced three supervisors, and a 2026 transmission fight that has turned the county against the regional grid buildout its own approvals helped summon. The null case turns out to be a case about where conflict goes when the front door is closed.
Disclosure: The author serves on the advisory board of an Alfred P. Sloan Foundation-funded study at Emory University on data centers and the Southern energy buildout. The study had no role in this case study.
Version 1.1 (October 2026) supersedes version 1.0. Corrections and updates for the items dated in the text, through October 24, 2026. Cite all versions: 10.5281/zenodo.20673529.