This book-length report examines what the Tennessee Valley Authority, a federal corporation, publishes about transmission lines whose need and route no outside body decides. Of TVA's 18 Tennessee project pages, one names the customer a line serves; none gives a megawatt figure.
TVA's own mapping files sometimes carry what the pages omit. A map service for a Sumner County line is named for Facebook; the project page cites growing load and reliability. The report does not claim the line was built for Meta.
Instead of a hearing, TVA holds an open house, usually 30 days, and none of the 18 pages shows a response to comments. For nine projects, the only public environmental record is a register row noting a categorical exclusion, meaning no environmental assessment, with no reasoning given.
The report says every practice it describes is within TVA's legal authority.
Summary of version 1.1, October 2026. The full report carries the record behind each point.
Full abstract
Volume II in the series Concentrated Benefit, Dispersed Burden . 237 pages, fifteen chapters in five parts, six appendices.
The Tennessee Valley Authority builds transmission lines across seven states and files no siting case for any of them. No state or federal body issues a certificate, holds a hearing on need, or reviews the route. The General Accounting Office reported the condition to Congress in 1982 (“the TVA Act does not require public involvement or information programs”), listed statutory fixes, and neither was enacted. Because nothing requires TVA to publish, what it chooses to publish is the public record.
This volume measures that record. Eighteen Tennessee transmission project pages are coded field by field: sixteen stated purposes name neither an end-use customer nor a load type, no page anywhere states a megawatt figure, and the environmental-review section carries the same template paragraphs on all eighteen. From TVA's own published route geometry, the volume computes that TVA studies 2.63 miles of corridor for every mile it selects. It reconstructs the categorical-exclusion record from 11,899 published determinations, and shows that exclusion 16's 125-acre right-of-way cap binds before its ten-mile figure for any corridor wider than about 103 feet.
Two tests changed the argument. Eighteen Dominion Energy Virginia project pages, coded against the same three codes, name an end-use customer on none of eighteen, and Dominion files a full adversary certificate case at the State Corporation Commission. The claim that a missing forum produces a missing name does not survive. What the forum produces is a record the page can point to: of the eight Dominion projects with a large-load customer, the SCC dockets name one in three and point to one in a fourth, while the pages name none. TVA has nowhere to point. Separately, a search of independent public records established that only three of the eighteen Tennessee projects had a nameable end-use customer at all, so the volume makes no general practice claim.
The volume states what it has not established. Ninety-five endnotes are marked as open items, each naming what the volume has not established and what would close it, and Appendix F lists them with the working files cited but not deposited.
The evidence is deposited separately and by hash at DOI 10.5281/zenodo.21959989. The records-request handbook is published separately as Getting the Record .