Tommy N. Turner

Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.

Portrait of Tommy N. Turner
Data Center LedgerFilings, minutes, orders and transcripts, logged as they are readLatest, Nov. 25: new report version →

All works

Virginia data center series — statewide and analytical volumes

  1. What Virginia Is Spending, What Virginia Is Getting: The Commonwealth Data Center Reference

    This statewide reference weighs what Virginia spends on data centers against what it gets. Its central finding: the sales tax break on data center equipment was worth about $1.9 billion in state and local tax to the industry in fiscal year 2025, by the operators' own reports.

    The anchor reference for the county case-study series.
  2. Governing the Demand Shock: Local Institutional Variation in Virginia's Data Center Boom (Report)

    This report compares how thirteen Virginia localities handled the spread of data centers from 2018 to 2026. Its central finding: the deciding factor was timing, when a community reformed its rules relative to the industry's arrival, not geography or project size.

    The compact report. The book edition carries the full narrative.
  3. Governing the Demand Shock: Data Centers, Local Power, and the Distribution of Cost in Virginia

    This book compares how Virginia's localities governed the data center wave from roughly 2018 to 2026, drawing on thirteen local case studies. Its finding: what separated communities that captured the benefits while containing the costs was neither geography nor project size, but the timing of local reform relative to the industry's arrival.

    Book edition of the report, written for a general reader.
  4. Who Showed Up: A Census of the Organizations Around Data Center Siting in Virginia, 2014 to 2026

    This census lists the organized groups on every side of Virginia's data center siting fights from December 2014 to September 26, 2026, from neighborhood groups and national environmental organizations to trade associations, lobbyists, building trades unions and the boards that decided.

    A census of every organised body found engaging data center siting in Virginia, on every side, December 2014 to 26 September 2026. Records presence and dates and does not assert cause. Register deposited separately (22998217); saved source pages held in a restricted record (22996886), released on request. Any organisation named may report an error in its row.
  5. Below the Curve: What Virginia Counties Chose Not to Measure

    In 2016, Loudoun County staff recommended against regulating tonal noise, the steady hum residents near data centers describe. They priced the alternative at $1,000 and wrote that it could put the county at a competitive disadvantage. The county declined.

    Supplement to the Commonwealth Data Center Reference (20679292). The county noise ordinance census workbook and a source companion are deposited in the same record. References the Loudoun (22374193), Prince William (20673498) and Pittsylvania (22968398) case studies and Governing the Demand Shock (20692386).
  6. Thirteen Cooperatives: Virginia's Distribution Cooperatives and the Arrival of Load Larger Than the System

    The General Assembly's audit agency, JLARC, projects that about 60 percent of Virginia's data center growth will land in the territory of its 13 electric cooperatives. This reference covers how they are organized, financed and regulated for loads larger than their systems.

    Reference companion to the Commonwealth Data Center Reference (20679292). Also addresses Va. Code § 56-234 D (2025 Acts of Assembly, chapters 499 and 598), which reframes the affiliate question. References the Mecklenburg (20673484), Botetourt (20673512), Culpeper (20673529), Google–CFS (20679935), and Governing the Demand Shock (20692386) volumes.
  7. Built for Someone Else: Generation, Load, and the Exception in Virginia

    This report maps four routes by which generation reaches Virginia's data centers. Under a 2020 law, the State Corporation Commission may approve a new utility-owned fossil plant only if the utility has met energy savings goals or the Commission finds a threat to reliability or security.

    Companion volume to the Commonwealth Data Center Reference (concept 20679292). Source manifest deposited separately as concept 22099427.
  8. Concentrated Benefit, Dispersed Burden: Who Carries Virginia's Data Center Transmission, and What the Cost-Allocation Record Does Not Trace

    On February 26, 2025, grid operator PJM's board approved the Joshua Falls to Yeat high-voltage line. PJM attributes the load growth behind it primarily to data centers.

    Volume I in the Concentrated Benefit, Dispersed Burden series — Virginia transmission cost allocation. Companion Zenodo dataset: 21959988 (utilities transmission-siting geographic data).
  9. What the Record Does Not Say: Interstate gas supply for Virginia generation, and a question no forum wrote down

    On November 25, 2025, Virginia's State Corporation Commission approved Dominion Energy Virginia's 944-megawatt Chesterfield Energy Reliability Center, a gas plant. After reconsidering, it reaffirmed that on February 12, 2026.

    Working paper. Companion to Built for Someone Else (22096613); supporting eleven-docket dataset deposited as 22757119.
  10. When the Operator Builds the Plant: The Google–CFS Power Purchase Agreement and What It Means for Virginia's Energy Market

    On June 30, 2025, Google agreed to buy 200 megawatts, half the planned output, from a fusion plant Commonwealth Fusion Systems plans in Chesterfield County. On September 22, 2025, Eni and the company announced a second deal for the plant, which they valued at more than $1 billion.

  11. No Field to Land In: How Three States' Water Withdrawal Forms Make Utility-Supplied Data Centers Illegible

    This paper reads the water withdrawal reporting forms of Virginia, Tennessee and Georgia field by field. Virginia and Tennessee rules treat a data center buying utility water as a customer, not a withdrawer, as does Georgia's surface water statute. The only report reaching the state is the utility's.

    Cross-state water-reporting analysis (VA, TN, GA). Documents the record void created by the utility-supplied-exemption plus form-field absence combination. Companion to the Virginia and Georgia water volumes.
  12. A Line Drawn on a Highway: Virginia's Groundwater Boundary, the Rivers Beyond It, and the Data Center Load the Regime Does Not Reach

    This report examines how Virginia regulates water west and north of the Fall Line. Its finding: Virginia counts its water everywhere and allocates it almost nowhere. Its rules ask about place, start date and source, not quantity.

    Companion volume to the Commonwealth Data Center Reference (concept 20679292); extends the coastal-aquifer thread from Two Systems (21816008) to the full groundwater and surface-water regime.
  13. Where the Instrument Stops: Virginia's Groundwater Ceiling, Its Grandfathered Rivers, and the Load Outside Both

    This brief sets three Virginia water reports side by side. It finds the state measured its groundwater where the data centers are not. Virginia limits groundwater by quantity only inside declared areas, and in the east that line is drawn at Interstate 95.

    Executive brief synthesizing three deposited water volumes (21556435, 21816008, 22105181). Carries four findings that none of the three volumes makes alone.
  14. Two Systems, One Drought: Virginia's Groundwater Ceiling, Its Rivers, and the Water the Energy Buildout Actually Uses

    This report examines Virginia's groundwater and river systems during the 2026 drought. Its central finding: Virginia has the authority to weigh the two together and does not do so systematically. It has never declared a surface water management area, which would let it require permits for river withdrawals and set a domestic-use priority.

  15. The Aquifer Says No: DEQ's SJ 25 Groundwater Study and the Data Center Question East of I-95

    In July 2026, Virginia's Department of Environmental Quality released its study of groundwater east of Interstate 95, ordered by the General Assembly.

  16. Who Builds the Data Centers: What the Employment Record Can and Cannot Show in Virginia, Georgia, and Tennessee

    This report asks what available records can show about who builds and staffs data centers in Virginia, Georgia and Tennessee. The construction trades are where the record runs out: none of the thirteen sources it reads counts the construction tradespeople on a data center site in any of the three states.

    Report. Reads thirteen employment sources side by side for Virginia, Georgia and Tennessee. The record also holds a capture of 410 data center job-board ads from October 19, 2026, as CSV files. Draws on the labor papers (22866646, 22861996) and their dataset (22862472).
  17. Membership grew faster than employment: A sixteen-year panel of inside electrical construction in hyperscale data center metros, 2010 to 2025

    This research note tracks union membership in inside electrical construction from 2010 to 2025, using the yearly reports IBEW locals file with the U.S. Department of Labor. In metro areas where Google, Meta, Microsoft or Amazon Web Services built data center campuses, membership grew 1.5 to 1.9 times as fast as electrical contractor employment.

    Research note, version 1.0. Own concept DOI; supersedes findings of 22310705's earlier v1.0 (which remains citable). Companion measurement paper is 22861996; shared replication dataset is 22862472.
  18. Counting a trade in one metropolitan area: union membership for inside electrical construction from federal filings, 2010 to 2025

    This paper builds a public dataset of union membership, 2010 to 2025, for every local of the electricians' union (IBEW) that filed a yearly report with the U.S. Department of Labor. The union's maps mark which locals do inside construction, the wiring of buildings.

    Measurement paper. Companion research note is 22866646; shared replication dataset is 22862472.
  19. Where the electricians went: Hyperscale data center construction and building trades membership in federal union filings, 2018 to 2025

    This working paper builds a count of union electricians from the yearly membership reports unions file with the U.S. Department of Labor under penalty of perjury. It follows 89 locals of the International Brotherhood of Electrical Workers that hold inside construction jurisdiction, the wiring of buildings, from 2018 to 2025.

    Working paper v0.1 with complete replication package. Uses federal union filings as an independent labor-measurement source. Effect concentrated in metros with hyperscale campuses; removing top-five-fastest-growing locals leaves 9.0 points and no significance.
  20. Counting Data Centers: The OpenStreetMap Inventory Behind a National County-Level Comparison

    This research note checks the data center counts behind the National Association of REALTORS® 2026 Data Center Impact Report, published September 9, 2026, which compares housing, jobs and electricity across four groups of counties.

    Working paper. Methodological note on the OpenStreetMap-derived facility file (Pacific Northwest National Laboratory) that underlies a widely-cited national inventory.
  21. Data Center Maps: A Register of What Exists, What Works, and Where It Fails

    This working register catalogues the resources that map, track or count data centers, nationally and in depth for Virginia, Georgia and Tennessee. Its main finding: no resource is a census. Every tracker's count for the three states disagrees with the others; Tennessee's run from 12 to 88 depending on the source.

    Register v0.1, resources checked 28 September 2026. The full report and register (PDF) is mirrored here; the two-page briefing and the filterable workbook, with a sheet for each state, are on the Zenodo record. Prince William County's Build-Out Analysis map is named as the closest existing template for a better map.
  22. Transmission Siting Disclosure Capture: TVA, Oncor/LCRA and Dominion Energy Virginia, August 2026

    A point-in-time capture of publicly published transmission line siting geographic data, retrieved 15 August 2026 by anonymous query against public ArcGIS REST endpoints.

    DatasetZenodo · 10.5281/zenodo.21959988
    Point-in-time dataset capturing which utilities publish vs. withhold transmission-siting geographic data (TVA, Oncor/LCRA, Dominion Energy Virginia).
  23. How a Data Center Gets Approved in Virginia: the approval route in each of Virginia's 133 counties and independent cities, and whether it triggers the state site assessment

    This report records how a data center gets approved in each of Virginia's 133 counties and independent cities, as of November 19, 2026. In 47, it finds a by-right route somewhere. By right means a project needs only the administrative permits any building needs.

    Version 1.0, current through November 19, 2026. Every count, table and figure is computed from the rows of the companion Entitlement Route Register (24151023).
  24. Who Is Building It: A Report on Virginia Data Center Sites in the Public Permit Record

    Reads the state and federal permit record for every Virginia county and independent city and finds 247 data center sites in it, in 26 counties and cities, 168 of them in Northern Virginia. Of the 131 active construction stormwater permits on those sites, 50 name a construction company as the operator, so a search of the state's list for the company that will run a campus misses more than a third of them. The count is not a census of data centers.

    Version 1.0, current through November 22, 2026. Every count comes from the companion dataset (24447222). Revised with each quarterly source audit.

Virginia data center series — county case studies

Fourteen Virginia case studies, each read from its own packets, minutes, ordinances and agreements.

  1. Case Study: Henrico County — How Two Neighborhoods Forced Henrico to Change Course

    On June 10, 2025, Henrico County's Board of Supervisors voted 5-0 to end by-right approval of data centers, meaning staff approval without a public hearing. New stand-alone data centers now need public hearings and the board's approval.

    The first case study in the county series.
  2. Case Study: Hanover County — Mountain Road, Tract, and the Search for Leverage

    On May 27, 2026, Hanover County's supervisors turned down a 900-megawatt data center campus, Tract's Mountain Road Technology Park, by a 4-3 vote.

  3. Case Study: Chesterfield County — The $0.24 Rate, the Thirty-Year Lock, and the Two-Corridor County

    In April 2019, Chesterfield County's Board of Supervisors set its tax on data center equipment at $0.24 per $100 of value. It was called the lowest rate in Virginia, and it deliberately undercut Henrico.

  4. Case Study: Mecklenburg County — Boydton, South Hill, and What Fifteen Years of Data Centers Actually Bought

    On August 27, 2010, Microsoft's plan for a data center in Boydton, the Mecklenburg County seat, was announced: up to $499 million in investment and 50 jobs. The buildout has since reached the edge of South Hill.

  5. Case Study: The Fredericksburg Ring — Five Jurisdictions, One Corridor, and the I-95 Path South

    Between 2022 and June 12, 2026, Spotsylvania, Stafford, Caroline and King George counties approved data center campuses with at least 5.4 gigawatts of reported capacity.

  6. Case Study: Orange County and the Town of Orange — Convergence at Two Scales: One Industry, Two Governments, and the Entitlement Neither Can Reach

    On February 17, 2026, the Town of Orange's council ended by-right data centers, those allowed without a public hearing, in its town center and required a special permit in every district where they are still allowed. On April 28, 2026, Orange County's supervisors voted 5-0 to confine county data centers to a Technology District that, as of June 12, 2026, covered no land.

  7. Case Study: Louisa County — The Overlay, the Amazon Retreat, and the $17 Billion Bet

    On April 3, 2023, Louisa County's supervisors adopted a Technology Overlay District, allowing data centers without a public hearing across roughly 6,400 acres. Within five months, Amazon Web Services committed $11 billion to two campuses there.

  8. Case Study: Goochland County — The Overlay and the Lawsuit

    At a November 6, 2025 meeting that ran past midnight, Goochland County's supervisors voted 4-1 to adopt a data center overlay of roughly 4,400 acres along Route 288, most of it with no public hearing per project. More than 80 people spoke against it.

  9. Case Study: Botetourt County — Project Raspberry, the Water Authority, and the Wave That Crossed the Blue Ridge

    On June 24, 2025, Botetourt County announced that Google had bought 312.55 acres of the county's Greenfield business park.

  10. Case Study: Culpeper County — The Quiet Successor

    On September 2, 2025, Culpeper County's supervisors unanimously required a special permit for data centers on industrial land countywide, exempting the technology zone and its five approved projects.

  11. Case Study: Prince William County — Governance Capture, the Revolving Door, and the Democratic Correction

    On March 31, 2026, Virginia's Court of Appeals upheld a ruling that voided the Prince William Digital Gateway, three data center rezonings covering about 1,760 acres. The hearing had not been properly advertised.

  12. Case Study: Loudoun County, Virginia — The Endgame Case: What It Costs to Change the Rules After the Industry Is Load-Bearing

    On March 18, 2025, Loudoun's supervisors voted 7-2 to require board approval for data centers where they had been allowed by right, meaning without a public hearing.

    The Endgame Case. Loudoun as the diagnostic county — what it costs to change the rules after the industry is load-bearing. isSupplementTo the Commonwealth Reference (20679292); references every other county case in the series.
  13. Case Study: Pittsylvania County — The County Turned Down One Data Center Plan, Then Rezoned for a Bigger One

    On April 15, 2025, Pittsylvania County's Board of Supervisors voted 6-1 to deny a rezoning of 763 acres for a private gas power plant and data centers. It had first refused the applicant's request to withdraw.

    Refusal, then entitlement by ordinance on the county's own motion. Traces the Berry Hill loop and substation built by Appalachian Power under the business-park pilot statute. isPartOf the Commonwealth Reference (20679292). Evidence snapshot 25 September 2026.
  14. Case Study: Fauquier County and the Town of Warrenton: The Restrictions Came After the Entitlements, and the Town Changed Sides

    In February 2023, the Warrenton Town Council approved an Amazon data center, 4-3. The town approved its site plan in April 2024. It remains unbuilt.

    Two governments in one county: the Town of Warrenton's Amazon permit, now struck as a use and challenged in court, and Fauquier County's restrictions at Remington and Vint Hill, adopted after the entitlements. Corrects the series' earlier use of Fauquier as a refusal case. Record read through 1 November 2026.

Georgia and Tennessee

Statewide reports and the federal record for the two companion states.

  1. What Georgia Is Spending, What Georgia Is Getting: A Statewide Data Center Report

    This statewide report weighs what data centers cost Georgia against what they return. Its lead finding, from a 2025 evaluation done for the state: the sales-tax break for data center equipment loses the state money in every year the study modeled, even counting the taxes the activity brings in.

  2. What Tennessee Is Building, and What It Is Not Regulating: A Statewide Data Center Report

    This statewide report maps Tennessee's data center buildout, roughly 61 facilities operating or under construction by mid-2026. Its organizing fact: the utility serving them, the federal Tennessee Valley Authority, answers to no state regulator. The rate a data center pays and the power plants built to serve it are decided where no Tennessee voter can reach.

  3. Declared, Not Measured: Volumetric Permit Triggers and Sub-Threshold Industrial Water Demand in Georgia

    This paper reads Georgia's groundwater permit law rule by rule. Anyone withdrawing more than 100,000 gallons of groundwater a day needs a permit, but the rules require regular reporting of actual withdrawals only from permit holders. Until a permit issues, the amount that settles whether one is needed is only the user's declaration.

    Extends the Virginia water thread (references 21816008 and 22105181) into Georgia. Data centers are the occasion; the design property is stated independently as a limiting case of Bennear (2008).
  4. What the Certificate Points At: Fuel disclosure, sealed cost, and one Georgia certification of 9,885 megawatts

    On December 19, 2025, Georgia's Public Service Commission granted in full two Georgia Power requests for capacity whose two parts total 9,885 megawatts. Its own advocacy staff had recommended 3,125, leaving out all three gas plants the company will build.

    Working paper, Georgia companion to What the Record Does Not Say (22754150). Shares the eleven-docket register 22757119 as supplement; part of the Built for Someone Else (22096613) source apparatus.
  5. Sufficiently Analogous: Federal need review for a gas shipper with no state regulator, in two Tennessee certificates

    The Federal Energy Regulatory Commission approved two Tennessee gas pipeline projects, Cumberland on January 18, 2024, and Ridgeline on April 2, 2025. In both, the Tennessee Valley Authority took the full capacity, for new TVA power plants.

    Working paper. Extends What the Record Does Not Say (22754150) and What the Certificate Points At (22754180) into Tennessee. Shares the eleven-docket register 22757119 as supplement.
  6. The Whole Record: What the Tennessee Valley Authority Publishes When Nothing Requires It

    This book-length report examines what the Tennessee Valley Authority, a federal corporation, publishes about transmission lines whose need and route no outside body decides. Of TVA's 18 Tennessee project pages, one names the customer a line serves; none gives a megawatt figure.

    Volume II in the Concentrated Benefit, Dispersed Burden series (Vol I = concept 21895588). 264 pages across fifteen chapters. Codes eighteen TVA project pages and reconstructs the categorical-exclusion record from 11,899 determinations.
  7. Getting the Record: A Guide to Requesting TVA Transmission and Siting Documents

    This guide is a working list of records requests for anyone researching Tennessee Valley Authority transmission lines and siting in Tennessee. No certificate proceeding or hearing reviews TVA's lines, so a records request, which yields documents after decisions rather than a voice before them, is the tool that exists.

    Practitioner guide companion to The Whole Record (21996375). Walks how to request TVA transmission and siting documents where no state PUC docket exists, given TVA's disclosure practice and NEPA categorical-exclusion pattern.

Radford and municipal fiscal

  1. Fiscal Crossroads: An Options Analysis of the City of Radford, Virginia

    This options analysis of Radford's finances calls one fact the most important: the general fund does not cover its own operations. In fiscal 2024 it took in $25.43 million and spent $33.14 million; even with money moved in from the electric utility, it ran about $3.74 million short.

  2. The Quiet Option: How Radford Drifted Into Fiscal Distress

    This study traces how Radford became a fiscally distressed city, using audited financial statements from 2011 through 2024. It finds that in every audited year, the city moved money from its electric utility into its general fund, $52.04 million over those years.

    Companion to Fiscal Crossroads.
  3. Two Cities, One Machine: Radford and Martinsville

    This report compares Radford and Martinsville, small Virginia cities that each own an electric utility and resell wholesale power to residents. In the year that ended June 30, 2024, each utility spent 80.8 cents of every revenue dollar on purchased power.

  4. What the Foundry Took

    In April 2017, Radford's city council passed a budget 3-2 over a warning, read into the minutes, that it was not sustainable and drew too heavily on the city's reserves.

    Published as Cardinal News diptych, June 10–11, 2026.
  5. Virginia College-City Fiscal Comparison: Charlottesville, Harrisonburg, Williamsburg, Radford

    This report compares the finances of four Virginia independent cities that host public universities: Charlottesville, Harrisonburg, Williamsburg and Radford. It finds that over the years studied, Radford is the only one whose net position, roughly what a government owns minus what it owes, declined, falling 35 percent while the other three grew.

  6. Choice Under Constraint: Enterprise-Fund Transfers and Divergent Fiscal Trajectories Among Virginia's Independent Cities

    This working paper compares Radford with similar Virginia cities. It finds the evidence consistent with this: a yearly transfer from Radford's electric utility to its general fund, alongside real structural pressure, materially reduced the city's margin of safety.

  7. The Handle: How American Cities Tax the Universities They Can't Tax

    This book examines how cities raise money connected to universities exempt from property tax. Its central argument: state law, much of it old and written for other purposes, often decides what a city can collect more than negotiations do.

Public power and utilities

Who sets the terms for customer solar at Virginia's public power systems and electric cooperatives.

  1. Who Sets the Terms for Customer Solar in Virginia

    Virginia law sets the terms on which customers of its three investor-owned utilities and 13 electric cooperatives connect rooftop solar. For the 16 public power systems, no section the report read in the state code's utility title does. Each system sets its own terms or sets none that the report located.

    Version 1.2. Register entries reflect documents read through November 19, 2026. The record also holds an eight-page summary of findings. Endnotes cite numbered rows of the companion register (24354108).

AI governance in higher education

  1. Governance Without Readiness: How 53 American Universities Responded to Generative AI

    This working paper looks at how 53 American universities, William & Mary's national peers and Virginia four-year schools, responded to generative AI, based on what each had published by March 2026. Its central finding: they responded mainly by governing AI. Fifty-two formed an AI committee or task force. Only four documented outreach to employers about the AI skills graduates need.

  2. Virginia Tech: Comprehensive AI Governance & Activity Inventory

    This inventory records what Virginia Tech had said and done publicly about artificial intelligence as of September 26, 2026. It finds that the gap between principle and implementation is the central challenge of the university's AI governance.

  3. Lehigh University: Comprehensive AI Governance & Activity Inventory

    This inventory records what Lehigh University had publicly said and done about artificial intelligence by June 10, 2026. It finds AI governance centralized in the provost's office. A Generative AI Advisory Group, set up on January 20, 2025, reported within four months.

  4. University of Virginia: Comprehensive AI Governance & Activity Inventory

    This inventory records what the University of Virginia had said and done publicly about artificial intelligence as of June 9, 2026. It finds that UVA's AI coordination is broad but its regulatory authority is narrow, and that the distance between them defines its AI governance.

  5. Marymount University: Comprehensive AI Governance & Activity Inventory

    This inventory records what Marymount University had said and done publicly about artificial intelligence as of April 6, 2026. Its most prominent finding is a gap: investment in AI programs is growing rapidly, while governance remains anchored in the academic integrity code and research review board.

  6. William & Mary: Comprehensive AI Governance & Activity Inventory

    This inventory records what William & Mary had said and done publicly about artificial intelligence across 13 units, as of March 2026. A university AI policy committee delivered its recommendations in July 2025, but the permanent AI council it proposed had not been formally set up eight months later.

  7. AI Governance Peer Institutional Benchmark: William and Mary's 23 BOV-Adopted National Peer Institutions

    This reference report profiles how 23 universities, the national peer group adopted by William & Mary's Board of Visitors, were handling generative AI as of March 2026. Each profile uses the same ten sections, from governance committees and classroom guidance to AI tools, academic integrity and research rules, drawn only from public sources.

  8. AI in Virginia Higher Education: Public-Source Reference Guide for 30 Four-Year Institutions

    This reference guide compiles what 30 Virginia four-year colleges and universities, public and private, had published about generative AI as of March 2026. Each entry follows the same ten parts, covering governance, teaching guidance, AI tools, academic integrity, research ethics and strategy.

James City County governance

  1. The Working Majority Public Dissent and Decision-Making on the James City County Board of Supervisors, 2010–2026

    This working paper examines how James City County's Board of Supervisors handled organized public opposition from January 2010 through February 2026. Under its strict test, four votes qualify: the Hazelwood Farms rezoning in February 2022 and three Government Center votes in 2025. The board approved all four.

  2. Two Changes on the James City County Board of Supervisors: A Longitudinal Cohort Analysis, 2010–2026

    This working paper studies how James City County's Board of Supervisors made decisions from 2010 to early 2026, using 3,136 recorded votes. It finds two changes, at different times, needing separate explanations.

  3. Representative Judgment After Public Opposition

    On October 14, 2025, three weeks before an election, James City County's Board of Supervisors voted to approve a $16.5 million early site work package for its Consolidated Government Center. Residents had cited a petition approaching 1,000 signatures and asked the board to wait.

  4. Public Participation and Representative Judgment in James City County

    On October 14, 2025, three weeks before a county election, James City County's Board of Supervisors approved two steps for its Consolidated Government Center: vacating part of a road right-of-way and a $16.5 million early site work package.

  5. Mounts Bay: A James City County Story, 2012–2026

    This book follows James City County's Board of Supervisors through its public meetings on Mounts Bay Road, from October 2012 to February 2026. Its central finding: a board that took its staff and Planning Commission recommendations as binding in 2012 came to override them on a recognizable set of cases, over split votes in 2016 and 2017 and by consensus from 2018 through 2023.

    Book-length narrative, v3 rev 4. isPartOf the Regional Government Records Corpus (22045517/20088873).
  6. Three Rooms: Williamsburg and James City County and the Joint School System, 1955–2026

    On October 10, 2025, James City County's supervisors, the Williamsburg City Council and the joint school board voted unanimously for a new contract for the school system the city and county have shared since 1955. For the first time, the school board is a party.

    Book-length institutional history, v3 rev 6. isPartOf the Regional Government Records Corpus (22045517/20088873).

Generative AI and knowledge systems

Scholarly thread on human-machine coupled knowledge systems. Companion pieces run on LinkedIn Pulse under Essays.

  1. Who Is Training Whom: Human Cognitive Drift and Machine Degradation in Coupled AI Knowledge Systems

    This working paper treats a person and an AI system as one system and asks how AI literacy training should change. In September 2026, four AI search products answered six questions about Virginia data-center policy, twice each. No cited page in the set documented its own check against a record.

    Working paper, scholarly companion to The Mountains That Were Not There (LinkedIn Pulse, 18 September 2026). Supplement dataset is the Source Diversity Audit (22741216).
  2. Where the Number Came From: How Generative Search Loses the Record, and What an Operator Can Do About It

    On September 11, 2026, four AI search products were asked what share of Loudoun County's local tax revenue comes from data centers. The answers and their cited pages carried six different percentages, each true of some base and year. Only one said which fraction it reported.

    Explanatory brief for people who run organizations; one worked case, no rate claim. Supplemented by the Source Diversity Audit dataset (22839545); the corpus-scale argument is in Who Is Training Whom (22839553).

Across the corpus

One essay drawing the research threads together, page-referenced to the deposited works.

  1. Who Was Assigned to Ask How Much: Institutions, Their Records, and the Fact Nobody Had a Field For

    This working paper reads across the author's earlier studies. Its finding: in the settings it examines, the decisive fact is reliably the one nobody has a field for.

    Working paper, version 1.2. Cites twenty-two works in this corpus; the related-works list below is the essay's bibliography.

Datasets and reference materials

Companion datasets, corpora, and reference documents. Cite the parent report where applicable.

  1. Fiscal Crossroads Workbook: City of Radford Audited Fiscal Data and Reconciliations, FY2011-FY2024

    The reproducibility workbook behind the Radford fiscal-distress research.

    Replication workbook for Fiscal Crossroads
  2. Governance without readiness: coding dataset of 53 US universities' generative-AI governance and readiness

    Institution-level coding of 53 US universities on four governance indicators and five readiness indicators, plus a descriptive AI-detection posture and a five-category whole-profile classification.

    DatasetZenodo · 10.5281/zenodo.21284051
    Coding dataset for Governance Without Readiness
  3. Virginia Data Center Research & Industry Directory

    Version 3.0 incorporates three months of portfolio work since v2.1 (March 22, 2026) and a full June 2026 re-verification of every entry.

    DeliverableZenodo · 10.5281/zenodo.20673582PDF
    Contact directory across Virginia data-center research
  4. Regional Government Records Corpus: A Longitudinal Public-Meeting Archive for Local Governance Research in Virginia

    The Regional Government Records Corpus is an independently assembled longitudinal archive of local-government public meeting materials spanning eleven Virginia jurisdictions across the Hampton Roads,…

    Statewide public-meeting archive — approximately 87,800 files across eleven Virginia localities (five at research depth, two comparison cases, four capability probes). Proof of concept for a statewide Virginia local-government records archive.
  5. Regional Government Records Corpus: Institutional Documentation Package (Volumes I-III)

    A three-volume institutional documentation package for the Regional Government Records Corpus, an independently assembled longitudinal archive of Virginia local-government public meeting records…

    ReportZenodo · 10.5281/zenodo.22045517PDF
    Three-volume institutional documentation package for the Regional Government Records Corpus (Overview, Methodology, Partnership Pitch). PDF mirror links to Volume I (Overview); Volumes II-III are Zenodo-only.
  6. Source manifest and datasets for 'Built for Someone Else: Generation, Load, and the Exception in Virginia'

    The data apparatus for Built for Someone Else: Generation, Load, and the Exception in Virginia (Virginia Data Center Series — Analytical Volumes, Version 1.0), concept DOI 10.5281/zenodo.22096613.

    DatasetZenodo · 10.5281/zenodo.22099427
    Source manifest for Built for Someone Else (concept 22096613) — 125 files including 108 primary source documents, each SHA256-hashed with URL of origin.
  7. Interstate Gas Supply Register: Georgia, Tennessee, Virginia, v1.4

    Tennessee, carried as a declared gap in every deposited version until now, is closed.

    DatasetZenodo · 10.5281/zenodo.22757119
    Interstate Gas Supply Register v1.0 — eleven FERC certificate dockets for interstate natural gas capacity serving Georgia, Tennessee and Virginia, compiled 11–13 September 2026. The unit is the docket, not the state. Companion dataset to What the Record Does Not Say (22754150).
  8. Source Diversity Audit: what the citations displayed by four generative search products reach, traced on six Virginia data-center policy questions (September 2026)

    Capture, tracing and coding data for an audit of what the citations displayed by four generative search products actually reach.

    Source Diversity Audit — capture, tracing and coding data for an audit of what the citations displayed by four generative search products (ChatGPT, Gemini, Perplexity, Grok) actually reach, on six Virginia data-center policy questions, September 12–13, 2026.
  9. Replication materials: by-right zoning, early vesting and the reach of local reform in Henrico County, Virginia, 2009 to 2026

    Version 1.2, October 11, 2026.

    Replication materials (v1.1) for a single-case documentary study of Henrico County's June 10, 2025 ordinance ending by-right approval of data centers — what the reform reached and who got a hearing. Supplement, tables, figure data and working notes. Cited from the study's data-availability statement; parent manuscript under journal review. References the Henrico case study (20671031).
  10. Who Showed Up: Register of the Organizations Around Data Center Siting in Virginia, 2014 to 2026

    The register behind Who Showed Up: A Census of the Organizations Around Data Center Siting in Virginia, 2014 to 2026 .

    DatasetZenodo · 10.5281/zenodo.22998217
    Register behind Who Showed Up (22996870): 223 rows (221 live), 23 columns, every value with the page it was read from and the date; codebook, counts-and-gaps file, conflict log, browser-pass record and a manifest of the 611 saved source pages. v1.3, evidence snapshot 26 September 2026.
  11. Virginia Data Center Entitlement Route Register: how every Virginia county and independent city, and five towns, approve a data center, and whether the approval engages Va. Code § 15.2-2209.5

    How every Virginia county and independent city, and five towns, approves a data center, and whether that approval is a rezoning, special exception or special use permit, the three that engage the site assessment in Va. Code § 15.2-2209.5.

    DatasetZenodo · 10.5281/zenodo.24151023
    Register v1.1, 138 rows. The statutory assessment applies to a new facility expected to need 100 megawatts or more. Each row names its source; workbook, CSV, sources file and a file of every cell changed since v1.0. Current through November 19, 2026.
  12. Who Is Building It: Virginia Data Center Sites in the Public Permit Record (dataset)

    828 records from seven public agency sources, placed by county or independent city and by planning district. The 428 permit and grant records are grouped into 247 data center sites only where their own text links them, so a campus filed under unrelated names appears as more than one site.

    DatasetZenodo · 10.5281/zenodo.24447222
    Version 1.0, current through November 22, 2026. Records, sites, summary and sources as CSV, the same tables in one workbook, and a codebook. Sources checked monthly; at most one new version a month; full audit each quarter.
  13. IBEW local union membership panel, 2010-2025: replication dataset for two studies of inside electrical construction

    Version 1.0, 20 September 2026.

    DatasetZenodo · 10.5281/zenodo.22862472
    IBEW Local Union Membership Panel, 2010–2025 (v1.0). Annual reported membership for IBEW local unions built from Form LM-2, LM-3 and LM-4 filings. Data + scripts + classification inputs + retrieval logs. Shared replication dataset for Where the Electricians Went (22310705), the measurement paper 22861996 and the sixteen-year research note 22866646.
  14. Who Sets the Terms for Customer Solar in Virginia: Register of Customer-Generation Terms at 32 Virginia Electric Utilities

    The terms on which each of 32 Virginia electric utilities lets residential customers connect solar and other generation: the 16 members of the Municipal Electric Power Association of Virginia, the 13 electric cooperatives on the State Corporation Commission's list, and the three investor-owned utilities as benchmarks. The register holds 416 sourced observations, each with its source and retrieval date, and most with a locator. For the 43 rows read from saved copies or received by correspondence, a crosswalk gives a public address where one exists, or says how the document can be obtained or that it is withheld.

    DatasetZenodo · 10.5281/zenodo.24354108
    Register v1.2, behind Who Sets the Terms for Customer Solar in Virginia (24354106). One workbook holds every table; six of the tables are also deposited as CSV files, with the map and the scripts.