Tommy N. Turner

Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.

Portrait of Tommy N. Turner
Data Center LedgerFilings, minutes, orders and transcripts, logged as they are readLatest, Nov. 25: new report version →

All works · Virginia data center series — statewide and analytical volumes

Below the Curve: What Virginia Counties Chose Not to Measure

Plain-English summary

In 2016, Loudoun County staff recommended against regulating tonal noise, the steady hum residents near data centers describe. They priced the alternative at $1,000 and wrote that it could put the county at a competitive disadvantage. The county declined.

Most of the local noise rules the report counted cannot register that hum: of 75 adopted rules, 64 have no tonal provision. The report traces this to choices about the measuring instrument, made for stated reasons.

In 2025 Prince William County staff raised every value in a stricter standard by six decibels; the board kept it only as advice. Chesapeake's council adopted no decibel limit in 2026.

The report finds the competitive-disadvantage claim does not survive the Virginia record. In what it examined, no operator is shown declining a Virginia site over noise rules. What is lost after approval is leverage, not affordability.

Summary of version 1.1, October 2026. The full report carries the record behind each point.

This report covers 9 Virginia localities. Each has a page under Places, with how a data center gets approved there and what else is on the record.

Full abstract

As of October 2026 Virginia has a budget mandate for state data center noise regulations due by the end of 2029, a governor's order to speed them up, and a growing list of local ordinances. Most of the local instruments cannot register what people living beside the buildings describe, a low and steady tonal hum: of the 75 adopted instruments in this volume's census, 64 carry no tonal provision and 62 no low-frequency provision, and three more on each count are coded n/a rather than none: Prince William's general noise ordinance and Culpeper County's light-industrial zoning standard on both counts, Prince William's advisory octave-band table on tonality, and Fauquier County's zoning performance standard, which has partial frequency resolution, on low frequency. The reason is a set of choices about the measuring instrument, made in public, at stated prices, for stated reasons.

The volume follows those choices. In 2016 Loudoun County staff recommended against regulating tonal noise, priced the alternative at $1,000, and gave the reason in writing: regulating it "may place the County at a competitive disadvantage." That rationale is absent from the two staff reports that preceded the July 2016 public hearing and present in the September report that followed it. In 2025 Prince William County built an octave-band standard with its own consultants, raised every value in it by six decibels, demoted it to an advisory appendix, and adopted a C-weighted limit instead, exempting the generator testing that its own definition names. In 2026 Chesapeake's staff proposed Prince William's numbers as "the most stringent adopted noise standards we identified in Virginia." The City Council adopted no number at all.

The competitive-disadvantage claim does not survive the Virginia record. Warrenton imposed the strictest data center permit conditions among the approvals examined and the applicant stayed, although nothing has been built there to test them; in King George the applicant proffered limits below the county's own ordinance. The cost the industry has not named in any Virginia venue examined can be estimated against a verified construction benchmark: Loudoun's $1,000 is 2.3 parts per million of one forty-megawatt building, and on this volume's estimate a designed-in mitigation package runs about one to two percent. What collapses after approval is leverage, not affordability.

Of the 75 adopted instruments in a census of 76 across 43 jurisdictions, more than half carry no numeric decibel limit, and eight carry any tonal provision. The volume closes on what Virginia's localities and the Department of Environmental Quality could adopt from instruments already written: a C-minus-A screening trigger, testing procured by the locality, and a measured pre-construction baseline.

Deposited with the volume: a claim-and-source companion grading each endnoted claim, and the ordinance census workbook (76 instruments, 43 jurisdictions).

Disclosure: The author serves on the advisory board of an Alfred P. Sloan Foundation-funded study at Emory University on data centers and the Southern energy buildout. The study had no role in this report.

Version 1.1 (October 2026) supersedes version 1.0. Corrections and updates for the items dated in the text, through October 24, 2026. Cite all versions: 10.5281/zenodo.23145782.

Supplement to the Commonwealth Data Center Reference (20679292). The county noise ordinance census workbook and a source companion are deposited in the same record. References the Loudoun (22374193), Prince William (20673498) and Pittsylvania (22968398) case studies and Governing the Demand Shock (20692386).

Cite this work

BibTeX
@misc{turner2026belowthecurvewhatvirgini,
  author = {Turner, Tommy N.},
  title = {Below the Curve: What Virginia Counties Chose Not to Measure},
  year = {2026},
  publisher = {Zenodo},
  version = {1.1},
  doi = {10.5281/zenodo.23145782},
  url = {https://doi.org/10.5281/zenodo.23145782}
}
APA
Turner, T. N. (2026). Below the Curve: What Virginia Counties Chose Not to Measure (Version 1.1). Zenodo. https://doi.org/10.5281/zenodo.23145782
Chicago
Turner, Tommy N. 2026. “Below the Curve: What Virginia Counties Chose Not to Measure.” Version 1.1. Zenodo. https://doi.org/10.5281/zenodo.23145782.