Data centers in Bath County, Virginia
What the public record holds for this locality: how a data center gets approved and what to read.
How a data center gets approved here
No zoning district lists a data center in the land use regulations as read by OCR (pages 76 and 77, tables that did not OCR, were not read), and any use not specifically permitted is prohibited. The county's zoning administrator wrote in an email of Nov. 17, 2026: "Bath has not updated its Land Use Regulations to address Data Centers, but we do have it on the list. At this point, if an application were received it would be under Conditional Use Permit process." The register follows that practice. In the land use regulations a conditional use is the special exception (Sec. 501.02), so approval triggers the state site assessment. The reply does not name the district or the deciding body, and the text read names no conditional use line for a data center in any district. The register rates this entry medium confidence.
On the text, the zoning administrator can classify a use by its resemblance to a listed one. Otherwise County Code Sec. 18-8(d) treats it as a use not provided for, which goes to public hearings before the Planning Commission and the Board of Supervisors, and the Board decides. A separate section, Sec. 502.01 of the land use regulations, says a use resembling no listed use may be permitted as an amendment to the regulations, and the two texts do not refer to each other. The nearest M-1 lines are public service or storage buildings and, as a conditional use decided by the Board of Zoning Appeals, wholesale businesses and storage warehouses.
On Sept. 28, 2026 the Planning Commission voted 4-0 to set a public hearing that includes a new Comprehensive Use Permissions Table. The draft table was not read.
- State site assessment
- Triggered. Approval here generates a rezoning, special exception or special use permit.
The register entry this is drawn from, in the dataset's own shorthand
- Position
- CONDITIONAL USE PERMIT (Zoning Administrator's statement, email of 11-17-2026; district and deciding body not stated)
- Where
- n/a; no district lists a data center (C-1, A-1, A-2, R-1 to R-5, B-1, B-2, B-3, M-1, FH-1, AH-1; Land Use Regulations read by OCR, pp. 76 and 77 not read)
- What the ordinance calls the use
- (none)
- Provision
- County Code Ch. 18 Secs. 18-8(c), 18-8(d); Land Use Regulations Secs. 302.230, 501.02, 502.01, 612.02, 612.03
- If the use is not listed
- DEFAULT PROHIBITION (Land Use Regulations Sec. 302.230: 'Any use not specifically permitted shall be prohibited') with ADMIN CLASSIFICATION by resemblance (Sec. 502.01; County Code Sec. 18-8(c)); otherwise 'USE NOT PROVIDED FOR' referral to Planning Commission and Board public hearings (County Code Sec. 18-8(d)); Sec. 502.01 separately says a use that resembles no listed use 'may be permitted as determined by the hearing body in public hearing as an amendment to these land use regulations' (the two texts do not refer to each other)
- Adopted
- Land Use Regulations: 'Effective: November 9, 2004', 'Latest amendment: May 8, 2018' (cover, OCR). County Code Ch. 18: 'Amended and adopted by Bath County Board of Supervisors January 14, 2025' (that amendment: Sec. 18-16 civil penalties); adoption date of Sec. 18-8(c) and (d) not read
- Changes and status
- No data center, data storage, computer or server term in the Land Use Regulations (160-page scan read by OCR; 'industrial' 31 hits as control; pp. 76 and 77 are tables that did not OCR) or in County Code Ch. 18. M-1 permitted uses (Sec. 612.02) and conditional uses (Sec. 612.03, decided by the Board of Zoning Appeals) name no such use; nearest lines are 'Public service or storage buildings' (defined in Sec. 302.169 as self-contained storage units) and 'Wholesale businesses, storage warehouses' (conditional). No Zoning Administrator classification of a data center found by term search of Board minutes 1-14-2025 to 10-21-2026 (43 files) and Planning Commission minutes for 2026 (6 files). Sec. 18-8(d) does not name the Board's decision a rezoning, special exception or special use permit; in Bath a conditional use is the special exception and the Board of Zoning Appeals decides it (Sec. 501.02). Planning Commission 3-23-2026: 'Data Centers were discussed' under comprehensive plan items, no motion. Planning Commission 9-28-2026 voted 4-0 to set a public hearing on Manufactured Homes, Accessory Dwelling Unit and a new Comprehensive Use Permissions Table (scheduled, not adopted; draft not read). No data center size or MW threshold: neither Ch. 18 nor the Land Use Regulations (OCR) has a data center provision. Zoning Administrator, email of 11-17-2026: 'Bath has not updated its Land Use Regulations to address Data Centers, but we do have it on the list. At this point, if an application were received it would be under Conditional Use Permit process.' The row follows that practice (codebook rule 5); in the Land Use Regulations a conditional use is the special exception (Sec. 501.02), so the route generates a special exception. The reply does not name the district or the deciding body, and the text read names no conditional use line for a data center in any district
- Still to read
- draft Comprehensive Use Permissions Table (Planning Commission set a hearing 9-28-2026; draft not read)
- Confidence in this reading
- Medium. The position is established but one element is unresolved: the adopting ordinance, the scope, how current the text is, or the type of source.
- Source as read
- County Code Ch. 18: 'Amended and adopted by Bath County Board of Supervisors January 14, 2025'; Land Use Regulations as posted by the county: 'Latest amendment: May 8, 2018' (scan, read by OCR). Read Nov. 14, 2026.
By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.
What to read
- Report: Built for Someone Else. An account of the four ways generation is built to serve Virginia data centers and the review each one gets.