Tommy N. Turner

Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.

Portrait of Tommy N. Turner
Data Center LedgerFilings, minutes, orders and transcripts, logged as they are readLatest, Nov. 25: new report version →

Data Centers · By locality

Data centers in Prince William County, Virginia

What the public record holds for this locality: how a data center gets approved, who is building, what has been filed and decided, and what to read.

Case study: Prince William County, read from local packets, minutes, ordinances and agreements.

Approval Coming up Who is building What to read

How a data center gets approved here

By right in an overlayBy right inside an overlay or a defined set of parcels laid on land already zoned.

A data center is allowed by right only on qualifying parcels inside the county's data center overlay, which is closed to expansion. A parcel qualifies if it was in the overlay on Sept. 21, 2026 and meets one of five eligibility pathways in § 32-509.02. Four pathways closed on Sept. 22, 2026. The fifth, for accepted filings, closes Dec. 21, 2026.

A special use permit is required in B-1, O(L), O(H), O(M), O(F), M-1, M-2, M/T and PBD/PMD land bays. Data centers are prohibited in A, R, PMR, B-2, B-3 and V. The Board adopted the change 8-0 on Sept. 22, 2026 (Ord. 26-67). An amended overlay map is to follow.

State site assessment
Not triggered on at least one route. A data center can be approved here, in at least one district or set of parcels, with no rezoning, special exception or special use permit. Other routes in the same locality may require one.
The register entry this is drawn from, in the dataset's own shorthand
Position
BY RIGHT inside closed overlay (qualifying parcels only); SUP outside
Where
Closed DCOZ Overlay: parcels in overlay on 9-21-2026 meeting a § 32-509.02 pathway, in O(L),O(H),O(M),O(F),M-1,M-2,M/T,PBD,PMD; SUP in B-1,O(L),O(H),O(M),O(F),M-1,M-2,M/T,PBD/PMD land bays; prohibited in A,R,PMR,B-2,B-3,V
What the ordinance calls the use
Data center
Provision
§32-509.03(2); §32-509.05(2); §32-509.06 (Ord. 26-67 text; not yet codified)
If the use is not listed
Not read
Adopted
Ord. 26-67 (DPA2026-00006), 9-22-2026, 8-0
Changes and status
Overlay closed to expansion; five eligibility pathways, four closed 9-22-2026, fifth (accepted filings) closes 12-21-2026; amended map to follow; zero-day substitute failed 3-5 (Prince William v3.2 note 188; Board Brief of 9-22-2026 not read); the PC's 120-day and setback amendments are not in the Ord. 26-67 text (on-disk copy searched)
Route before the change
By right in an overlay
Date of the change
2026-09-22
Still to read
Amended DCOZ boundary map (county to publish after the 12-21-2026 eligibility deadline)
Confidence in this reading
Medium. The position is established but one element is unresolved: the adopting ordinance, the scope, how current the text is, or the type of source.
Source as read
Municode version Sep 3, 2026; Ord. 26-67 listed adopted 9/22/26, not codified. Read Nov. 4, 2026.

By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.

Coming up

Who is building here: the public record

53 data center sites in the permit record for Prince William County, grouped by site only where the records themselves link them, so one campus can appear as more than one site.

Data center sites found in the free state and federal records searched for Prince William County, and utility filings placed in the same locality, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.

Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.

What to read

This page covers only what these sources contain. A locality with little here may still have data center activity.