Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.

Portrait of Tommy N. Turner
Data Center LedgerFilings, minutes, orders and transcripts, logged as they are readLatest, Nov. 25: new report version →

Data Centers · By locality

Data centers in Louisa County, Virginia

What the public record holds for this locality: how a data center gets approved, who is building, and what to read.

Case study: Louisa County, read from local packets, minutes, ordinances and agreements.

Approval Who is building What to read

How a data center gets approved here

Permit requiredA discretionary permit is required: a conditional or special use permit, a special exception or a provisional use permit.

A data center needs a conditional use permit in the county's Technology Overlay District. The Board made the use by right there on April 3, 2023 (Ord. 2023-6), then changed it to a conditional use permit on Aug. 5, 2024 (Ord. 2024-11) and reduced the district. The register's note on the reduction reads "district shrunk ~2,000 ac."

Both AWS campuses are grandfathered. An application for a third campus (CUP2025-05) was withdrawn in July 2025.

State site assessment
Triggered. Approval here generates a rezoning, special exception or special use permit.
The register entry this is drawn from, in the dataset's own shorthand
Position
CONDITIONAL USE PERMIT
Where
TOD, all principal uses
What the ordinance calls the use
Data centers
Provision
§86-333
If the use is not listed
Not read
Adopted
Ord. 2023-6 (4-3-2023) BY RIGHT -> Ord. 2024-11 (8-5-2024) CUP
Changes and status
By right Apr 2023 -> CUP Aug 2024; district shrunk ~2,000 ac. Both AWS campuses grandfathered. Third campus (CUP2025-05) withdrawn July 2025
Route before the change
By right in an overlay
Date of the change
2024-08-05
Still to read
Ord. 2024-11 of 8-5-2024 (not read; adoption known from the codifier history note)
Confidence in this reading
Medium. The position is established but one element is unresolved: the adopting ordinance, the scope, how current the text is, or the type of source.
Source as read
Ordinance No. 2026-12, enacted May 4, 2026 (Supp. No. 82, Update 3); not-yet-codified list read through ORD-2026-33 (9-21-2026). Read Nov. 4, 2026.

By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.

Who is building here: the public record

6 data center sites in the permit record for Louisa County, grouped by site only where the records themselves link them, so one campus can appear as more than one site.

Data center sites found in the free state and federal records searched for Louisa County, and utility filings placed in the same locality, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.

Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.

What to read

This page covers only what these sources contain. A locality with little here may still have data center activity.