Tommy N. Turner

Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.

Portrait of Tommy N. Turner
Data Center LedgerFilings, minutes, orders and transcripts, logged as they are readLatest, Nov. 25: new report version →

Data Centers · By locality

Data centers in Frederick County, Virginia

What the public record holds for this locality: how a data center gets approved, who is building, what has been filed and decided, and what to read.

Approval On the record Who is building What to read

How a data center gets approved here

No approval routeThe use is unlisted and prohibited, or no route permits it.

Data centers have been removed from the county's zoning districts, and an unlisted use is prohibited, so there is no approval route. The Board voted 6-1 on Sept. 23, 2026 to remove the use, its definition and its standards.

The use had been by right in B3, TM, M1 and M2 since July 10, 2024. On April 9, 2025 the county moved B3, M1 and M2 to a conditional use permit and left TM by right. The Board directed the removal on July 8, 2026.

A resolution adopted 7-0 the same day as the removal grandfathered two applications only, CUP #03-26 and REZ #04-26. The rezoning was withdrawn. The outcome of the permit application is not established, because the Board minutes of Oct. 28, 2026 were not read; the Board files for Oct. 28 and Nov. 12, 2026 could not be opened. The Middletown Data Center is now nonconforming. The register also records "TM district removal postponed to 11-12-2026 (scheduled, not adopted)."

State site assessment
Does not arise. No approval route currently exists.
The register entry this is drawn from, in the dataset's own shorthand
Position
REMOVED FROM ALL DISTRICTS (UNLISTED = PROHIBITED)
Where
n/a (removed from B3, TM, M1, M2)
What the ordinance calls the use
(none; use, definition and standards removed 9-23-2026; formerly 'Computing Infrastructure Providers, Data Processing, and Data Centers')
Provision
Sec. 165-601.02(D); Sec. 165-602.01; use row removed from Sec. 165-603.02 use matrix; Secs. 165-705.01 and 165-1105.05 removed (Phase I numbering, adopted 5-13-2026)
If the use is not listed
ADMINISTRATOR DETERMINATION, closed for data centers: Sec. 165-602.01(A)(1) 'not similar to any listed use type, that use is prohibited'; 9-23-2026 ordinance recital: data centers 'shall not be construed to be similar to any use listed'
Adopted
Ordinance amending Ch. 165 (removal of data centers), adopted 9-23-2026, 6-1 (Oates No); no ordinance number printed; minutes approved 10-14-2026; listed as uncodified New Law on eCode360
Changes and status
By right B3,TM,M1,M2 from 7-10-2024; 4-9-2025 moved B3,M1,M2 to CUP (TM by right); BOS 7-8-2026 directed removal; adopted 9-23-2026 removing data centers from all districts. Grandfathering resolution 9-23-2026 (7-0) limited to CUP #03-26 and REZ #04-26, hearing on or before 10-28-2026; REZ #04-26 withdrawn per 10-28-2026 agenda; CUP #03-26 outcome not established (10-28-2026 Board minutes not read). Middletown Data Center nonconforming. TM district removal postponed to 11-12-2026 (scheduled, not adopted). Currency check of 11-15-2026: the Board files for 10-28 and 11-12-2026 could not be opened and were not read
Route before the change
By right
Date of the change
2026-09-23
Still to read
Board minutes of 10-28-2026 (CUP #03-26 outcome under the grandfathering resolution; not read)
Confidence in this reading
High. Ordinance text read directly, citation verified, the position unambiguous.
Source as read
eCode360 'Code 2026-05-13'; 9-23-2026 amendment listed under New Laws (not codified). Read Nov. 4, 2026.

By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.

On the record

Primary documents read for the Data Center Ledger, newest first. Each title links to the official copy.

Who is building here: the public record

1 data center site in the permit record for Frederick County, grouped by site only where the records themselves link them, so one campus can appear as more than one site.

Data center sites found in the free state and federal records searched for Frederick County, and utility filings placed in the same locality, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.

Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.

What to read

This page covers only what these sources contain. A locality with little here may still have data center activity.