Data Centers · By locality

Data centers in Fauquier County, Virginia

What the public record holds for this locality: how a data center gets approved, who is building, and what to read.

Case study: Fauquier County and Town of Warrenton, read from local packets, minutes, ordinances and agreements.

Approval Who is building What to read

How a data center gets approved here

Permit requiredA discretionary permit is required: a conditional or special use permit, a special exception or a provisional use permit.

A data center needs a special exception and is allowed only in the PCID district. A county staff report of Oct. 8, 2026 says Vint Hill is currently the only location in the county zoned PCID. Every data center in PCID must use closed-loop or air cooling and underground lines.

The Board adopted the change 4-1 on Oct. 8, 2026. It removed data centers from the BP district except on parcels zoned BP on Aug. 20, 2026. Exemptions fixed as of that date cover OVH, CyrusOne, Land Bay V and BP-zoned parcels (Remington Technology Park).

State site assessment
Triggered. Approval here generates a rezoning, special exception or special use permit.
The register entry this is drawn from, in the dataset's own shorthand
Position
SPECIAL EXCEPTION (PCID only); removed from BP
Where
PCID (staff report of 10-8-2026: "Currently, Vint Hill is the only location in the County which is zoned PCID."); BP removed except parcels zoned BP on 8-20-2026
What the ordinance calls the use
Data Center
Provision
ZO §4-605(c); §4-601; def. §15-300 (TEXT-26-027401)
If the use is not listed
Default prohibition, §2-302(1)
Adopted
TEXT-26-027401, BOS 10-8-2026, 4-1
Changes and status
Data center removed from BP (§3-316 row, §3-200.12, fn 25); all PCID data centers by SE with closed-loop or air cooling and underground lines; exemptions fixed at 8-20-2026 cover OVH, CyrusOne, Land Bay V, BP-zoned parcels (Remington Technology Park)
Route before the change
Rezoning required
Date of the change
2026-10-08
Confidence in this reading
High. Ordinance text read directly, citation verified, the position unambiguous.
Source as read
Posted Art. 3 (uploaded 4-1-2026) and Art. 4 (8-21-2026) predate the amendment; adopted-amendment list through 7-9-2026. Read Nov. 4, 2026.

By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.

Who is building here: the public record

3 data center sites in the permit record for Fauquier County, grouped by site only where the records themselves link them, so one campus can appear as more than one site.

Data center sites found in the free state and federal records searched for Fauquier County, and utility filings placed in the same locality, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.

Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.

What to read

This page covers only what these sources contain. A locality with little here may still have data center activity.