Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.
Data centers in Stafford County, Virginia
What the public record holds for this locality: how a data center gets approved, who is building, and what to read.
Case study: Fredericksburg Ring, read from local packets, minutes, ordinances and agreements.
Approval Who is building What to read
How a data center gets approved here
A data center is allowed by right in the M-2 district and in the ICTP overlay. Before 2023 it was also by right in B-2, REC and M-1. An ordinance adopted Oct. 17, 2023 narrowed it to M-2 and the overlay.
On March 18, 2025 the Board of Supervisors voted 4-3 against an amendment that would have required a conditional use permit in M-2, according to press reports; the minutes were not read. The posted Board agenda for Oct. 27, 2026 carried no data center item. The Board's Nov. 17, 2026 work session agenda lists two discussions: removing data centers as a by-right use in M-2, and removing them from the Technology Zone ordinance (Ch. 23A). These are discussion items, and no amendment had been initiated or set for hearing on the records read through Nov. 15, 2026.
- State site assessment
- Not triggered on at least one route. A data center can be approved here, in at least one district or set of parcels, with no rezoning, special exception or special use permit. Other routes in the same locality may require one.
The register entry this is drawn from, in the dataset's own shorthand
- Position
- BY RIGHT
- Where
- M-2; ICTP Overlay
- What the ordinance calls the use
- Data center
- Provision
- Ch.28 §28-35 Tbl 3.1; stds §28-39(q)
- If the use is not listed
- Conditional use permit route, §28-37
- Adopted
- Ord. O23-24, 10-17-2023
- Changes and status
- Pre-2023 by right in B-2,REC,M-1,M-2,ICTP; narrowed to M-2+ICTP. BOS REJECTED amendment requiring CUP in M-2, 4-3, 3-18-2025 (press, via Fredericksburg Ring v1.1 note 41; minutes not read). the posted Board agenda for 10-27-2026 carries no data center item; the Board's 11-17-2026 work session agenda lists a discussion of removing data centers as a by-right use in M-2 and a discussion of removing data centers from the Technology Zone ordinance (Ch. 23A); discussion items, no amendment initiated or set for hearing on the records read through 11-15-2026
- Route before the change
- By right
- Date of the change
- 2023-10-17
- Still to read
- Ord. O23-24 of 10-17-2023 (not read; adoption known from the codifier history note)
- Confidence in this reading
- Medium. The position is established but one element is unresolved: the adopting ordinance, the scope, how current the text is, or the type of source.
- Source as read
- Municode version Aug 3, 2026; adopted-not-codified list through O26-38 (10-20-2026), none on data centers. Read Nov. 4, 2026.
By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.
Who is building here: the public record
5 data center sites in the permit record for Stafford County, grouped by site only where the records themselves link them, so one campus can appear as more than one site.
Data center sites found in the free state and federal records searched for Stafford County, and utility filings placed in the same locality, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.
Stafford Technology Campus (STC) 12 records
- Construction stormwater permit VAR10X144 · 25156403 DATA CTR-STAFFORD TECH CAMPUS PH4 SOUTHCAMPUS WEST · EE Reed Construction - East Coast, LLC
- Construction stormwater permit VAR10X143 · 25156800 STC Reuse Water Storage Tanks · EE Reed Construction - East Coast, LLC
- Construction stormwater permit VAR10X704 · AP#25156887 STAFFORD TECHNOLOGY CAMPUS (STC) STATE SHOP ROAD · EE Reed Construction - East Coast, LLC
- Construction stormwater permit VAR10V199 · Stafford Technology Campus (STC) · E.E. Reed Construction - East Coast, LLC
- Construction stormwater permit VAR10X396 · Stafford Technology Campus (STC) Construction Logistics · EE Reed Construction - East Coast, LLC
- Construction stormwater permit VAR10W999 · Stafford Technology Campus (STC) Eskimo Hill Connector Road · EE Reed Construction - East Coast, LLC
- Construction stormwater permit VAR10W092 · Stafford Technology Campus (STC) Phase 1 · EE Reed Construction - East Coast, LLC
- Construction stormwater permit VAR10W478 · Stafford Technology Campus (STC) Phase 2 West Campus · EE Reed Construction - East Coast, LLC
- Construction stormwater permit VAR10W479 · Stafford Technology Campus (STC) South Campus - East · EE Reed Construction - East Coast, LLC
- Construction stormwater permit VAR10W601 · Stafford Technology Campus (STC) West Substation · EE Reed Construction - East Coast, LLC
- Permit filing, VDOT Land Development 26157198 · Data Center Stafford Tech Campus DED and Easement · Bohler
- Permit filing, VDOT Land Development 26157116 · Stafford Tech Campus South East DED - Data Center · Timmons
Project Sisson 3 records
- Public notice (wetlands and streams) NAO-2025-01543 · NAO-2025-01543 (Project Sisson, Stafford, Virginia)
- Permit filing, DEQ VWPP 26-1702 · Project Sisson · Real Estate Pursuits LC
- Public notice (wetlands and streams) NAO-2025-01543 · NAO-2025-01543 (Project Sisson, Stafford County)
NAO-2022-02671 (Stafford Technology Center, Stafford, Virginia) 1 record
- Public notice (wetlands and streams) NAO-2022-02671 · NAO-2022-02671 (Stafford Technology Center, Stafford, Virginia)
Potomac Creek 1 record
- Permit filing, VMRC Habitat Management 20261979 · Potomac Creek · VANTAGE DATA CENTERS VA 41, LLC
Vantage VA-4 1 record
- Construction stormwater permit VAR10V663 · Vantage VA-4 · DPR Construction
Melrod Campus Bridging Vantage 4 1 record
- Construction stormwater permit VAR10W364 · Melrod Campus Bridging Vantage 4 · Virginia Electric and Power Co d/b/a Dominion Energy Virginia
Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.
What to read
- Case study: Fredericksburg Ring. Between 2022 and June 12, 2026, the five jurisdictions surrounding the Rappahannock River fall line (Spotsylvania, Stafford, Caroline, and King George counties, and the independent City of…
- Report: Who Showed Up. A census of the organizations around data center siting in Virginia, 2014 to 2026.
- Book: Governing the Demand Shock. A comparison of how Virginia localities handled the arrival of data centers.
This page covers only what these sources contain. A locality with little here may still have data center activity.