Data Centers · By locality

Data centers in Stafford County, Virginia

What the public record holds for this locality: how a data center gets approved, who is building, and what to read.

Case study: Fredericksburg Ring, read from local packets, minutes, ordinances and agreements.

Approval Who is building What to read

How a data center gets approved here

By rightThe ordinance names the use and permits it by right.

A data center is allowed by right in the M-2 district and in the ICTP overlay. Before 2023 it was also by right in B-2, REC and M-1. An ordinance adopted Oct. 17, 2023 narrowed it to M-2 and the overlay.

On March 18, 2025 the Board of Supervisors voted 4-3 against an amendment that would have required a conditional use permit in M-2, according to press reports; the minutes were not read. The posted Board agenda for Oct. 27, 2026 carried no data center item. The Board's Nov. 17, 2026 work session agenda lists two discussions: removing data centers as a by-right use in M-2, and removing them from the Technology Zone ordinance (Ch. 23A). These are discussion items, and no amendment had been initiated or set for hearing on the records read through Nov. 15, 2026.

State site assessment
Not triggered on at least one route. A data center can be approved here, in at least one district or set of parcels, with no rezoning, special exception or special use permit. Other routes in the same locality may require one.
The register entry this is drawn from, in the dataset's own shorthand
Position
BY RIGHT
Where
M-2; ICTP Overlay
What the ordinance calls the use
Data center
Provision
Ch.28 §28-35 Tbl 3.1; stds §28-39(q)
If the use is not listed
Conditional use permit route, §28-37
Adopted
Ord. O23-24, 10-17-2023
Changes and status
Pre-2023 by right in B-2,REC,M-1,M-2,ICTP; narrowed to M-2+ICTP. BOS REJECTED amendment requiring CUP in M-2, 4-3, 3-18-2025 (press, via Fredericksburg Ring v1.1 note 41; minutes not read). the posted Board agenda for 10-27-2026 carries no data center item; the Board's 11-17-2026 work session agenda lists a discussion of removing data centers as a by-right use in M-2 and a discussion of removing data centers from the Technology Zone ordinance (Ch. 23A); discussion items, no amendment initiated or set for hearing on the records read through 11-15-2026
Route before the change
By right
Date of the change
2023-10-17
Still to read
Ord. O23-24 of 10-17-2023 (not read; adoption known from the codifier history note)
Confidence in this reading
Medium. The position is established but one element is unresolved: the adopting ordinance, the scope, how current the text is, or the type of source.
Source as read
Municode version Aug 3, 2026; adopted-not-codified list through O26-38 (10-20-2026), none on data centers. Read Nov. 4, 2026.

By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.

Who is building here: the public record

5 data center sites in the permit record for Stafford County, grouped by site only where the records themselves link them, so one campus can appear as more than one site.

Data center sites found in the free state and federal records searched for Stafford County, and utility filings placed in the same locality, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.

Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.

What to read

This page covers only what these sources contain. A locality with little here may still have data center activity.