Data centers in Spotsylvania County, Virginia

What the public record holds for this locality: how a data center gets approved, who is building, and what to read.

Case study: Fredericksburg Ring, read from local packets, minutes, ordinances and agreements.

Approval Who is building What to read

How a data center gets approved here

Permit requiredA discretionary permit is required: a conditional or special use permit, a special exception or a provisional use permit.

The register reads a data center as needing a special use permit in every district. No by-right listing was found in the parts read on Nov. 4, 2026, which were the I-2 section (§ 23-6.22.4) and the Office definition. Divisions 15-21 and 25 were not read.

The county changed its rules twice. Before 2025 data centers were by right without being named, because the definition of "Office" expressly included them. The register traces the path from there to I-1 and I-2 and then to removal from the by-right lists. The Office definition now reads: "Data centers shall not be deemed to be an office use." The two ordinances are dated Dec. 9, 2025 and Feb. 24, 2026, and the register does not say what each did.

State site assessment
Triggered. Approval here generates a rezoning, special exception or special use permit.
The register entry this is drawn from, in the dataset's own shorthand
Position
SUP in EVERY district
Where
all; no by-right listing found (I-2 § 23-6.22.4 and the Office definition read 11-4-2026; Divs. 15-21 and 25 not read)
What the ordinance calls the use
Data center
Provision
Ch.23 Art.6 Divs.15-22,25
If the use is not listed
Not read
Adopted
Ord. 23-190 (12-9-2025); Ord. 23-192 (2-24-2026)
Changes and status
Twice: SILENT BY-RIGHT pre-2025 ('Office' def. expressly included 'data centers') -> I-1/I-2 -> removed from by-right lists (Office definition now: 'Data centers shall not be deemed to be an office use.')
Route before the change
by right (form not established)
Date of the change
not established
Still to read
Ord. 23-190 of 12-9-2025 (not read; adoption known from the codifier history note)
Confidence in this reading
Medium. The position is established but one element is unresolved: the adopting ordinance, the scope, how current the text is, or the type of source.
Source as read
Municode: 'Codified through Ordinance No. 7-18, adopted May 26, 2026. (Supp. No. 137, Update 1)'; no Ch. 23 ordinance on the not-yet-codified list. Read Nov. 4, 2026.

By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.

Who is building here: the public record

3 data center sites in the permit record for Spotsylvania County, grouped by site only where the records themselves link them, so one campus can appear as more than one site.

Data center sites found in the free state and federal records searched for Spotsylvania County, and utility filings placed in the same locality, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.

Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.

What to read

This page covers only what these sources contain. A locality with little here may still have data center activity.