Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.
Data centers in Pulaski County, Virginia
What the public record holds for this locality: how a data center gets approved, who is building, and what to read.
Approval Who is building What to read
How a data center gets approved here
A data center is allowed by right in LI, I and PID, and the use table also marks it permitted in the AO Airport Overlay column. It is prohibited in C, A, RR, R, LR, MR, HR, RC, CM, PUD, LO and CLO.
The row is unchanged across the 2023, 2024 and September 2026 editions of the Unified Development Ordinance. The first adopting ordinance was not identified, and editions before 2023 were not located. An ordinance of Sept. 28, 2026, effective Oct. 1, 2026, amends other parts of the ordinance, including the Duplex and Manufactured Housing rows of the land use table, and adds sound attenuation for energy generation equipment of 500 kW or more on a site. Its text names no change to the data center row. The amended land use table attached to it is image-only and was not read, and the vote was not read.
County officials told citizens in March 2026, according to press reports, that any data center would go to the NRV Commerce Park, run by Virginia's First Regional Industrial Facility Authority. The zoning of those parcels was not checked.
- State site assessment
- Not triggered on at least one route. A data center can be approved here, in at least one district or set of parcels, with no rezoning, special exception or special use permit. Other routes in the same locality may require one.
The register entry this is drawn from, in the dataset's own shorthand
- Position
- BY RIGHT
- Where
- LI, I, PID (P also marked in AO Airport Overlay column); blank (prohibited) in C, A, RR, R, LR, MR, HR, RC, CM, PUD, LO, CLO
- What the ordinance calls the use
- Data Center
- Provision
- UDO § 4.21 Table 4.1 (Land Use Table), Sept. 2026 edition p. 58; legend § 4.21(A) 'Permitted Use (P): Uses that are permitted by-right'; no definition of Data Center found in Art. 11 (two "data cent" hits in the Sept. 2026 edition, neither a definition)
- If the use is not listed
- DEFAULT PROHIBITION with UDO Administrator compatibility determination (§ 11.2(B)) - use expressly listed, rule not reached
- Adopted
- Row present (same marks) in UDO as amended and readopted 4-24-2023 (udo-2023.pdf p. 57) and in 2024 edition; first adopting ordinance not identified (editions before 2023 not located)
- Changes and status
- Data Center row unchanged across 2023, 2024 and Sept. 2026 editions (text sequence; x-position cell read on 2026 edition only). UDO p. 2 lists 'Amended: September 28, 2026'; the 9-28-2026 ordinance (effective 10-1-2026; BoardDocs) amends Art. 3.1(L)(10), Table 4.1 (Duplex and Manufactured Housing rows), Art. 4.22(A)(10) and Art. 6.9 and adds Art. 5.2.1, sound attenuation for energy generation equipment of 500 kW or more on a site; the ordinance text names no Data Center change (the attached amended land use table is image-only and was not read; the vote was not read). County officials told citizens (Mar. 2026, press) that any data center would go to the NRV Commerce Park run by Virginia's First RIFA; zoning of those parcels not checked
- Still to read
- The amended land use table attached to the 9-28-2026 ordinance (image-only, not read)
- Confidence in this reading
- Medium. The position is established but one element is unresolved: the adopting ordinance, the scope, how current the text is, or the type of source.
- Source as read
- UDO p. 2: 'Amended: September 2 8 , 2026' (latest listed). Read Nov. 4, 2026.
By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.
Who is building here: the public record
1 data center site in the permit record for Pulaski County, grouped by site only where the records themselves link them, so one campus can appear as more than one site.
Data center sites found in the free state and federal records searched for Pulaski County, and utility filings placed in the same locality, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.
Wythe County Data Center 1 record
- Permit filing, DEQ VWPP SSWD-000981 · Wythe County Data Center · The Ardent Companies
Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.
What to read
- Report: Who Showed Up. A census of the organizations around data center siting in Virginia, 2014 to 2026.
This page covers only what these sources contain. A locality with little here may still have data center activity.