Data centers in New Kent County, Virginia
What the public record holds for this locality: how a data center gets approved, who is building, what has been filed and decided, and what to read.
Approval Coming up Who is building What to read
How a data center gets approved here
The ordinance does not list data centers. Under Article XIX an unlisted use can apply for a conditional use permit in any district, and a statement by Airaghi on Feb. 24, 2026 says any unlisted use could come in for one. The Berkley Group Zoning Diagnostic of June 29, 2026 says data centers are not currently permitted in the county.
A draft technology overlay district was discontinued July 13, 2026. At a Board work session on Sept. 29, 2026 a resolution to start a two-year moratorium failed 2-3. Staff presented draft performance standards that would allow a data center by conditional use permit on industrial-zoned land only, with minimums of 75 and 200 acres. The Board took no action. A joint Board and Planning Commission work session was added for Dec. 8, 2026. The Board files for Oct. 26 and Nov. 12, 2026 could not be opened and were not read.
- State site assessment
- Triggered. Approval here generates a rezoning, special exception or special use permit.
The register entry this is drawn from, in the dataset's own shorthand
- Position
- CUP required (unlisted-use route)
- Where
- any district via Art. XIX
- What the ordinance calls the use
- (none; legacy category does not reach it)
- Provision
- Sec. 98-8(7) unlisted uses prohibited; Sec. 98-61 CUP route. Sec. 98-2 "Computer and data processing center" = orders, claims, telemarketing; a BPO definition
- If the use is not listed
- CUP ROUTE (Secs. 98-8(7), 98-61)
- Adopted
- Ch.98 Supp. 26 Update 1 (codified thru O-08-26, 6-8-2026)
- Changes and status
- Berkley Group Zoning Diagnostic (6-29-2026): "Data centers are not currently permitted in the County"; 15.2-2209.5 compliance "No", "No Reference." Airaghi, 2-24-2026: not a listed use, any unlisted use "could come in for a CUP." TOD draft discontinued 7-13-2026. BOS work session 9-29-2026: R-41-26 (initiate 2-yr moratorium) FAILED 2-3; staff draft DC performance standards presented, no action (draft: Data Center = CUP on industrial-zoned land only, 75/200-ac minimums); 30-day citizen review item pulled. BOS 10-13-2026: no DC item on the action agenda (packet text layer searched; 18 image pages not read); joint BOS/PC work session added 12-8-2026. Currency check of 11-15-2026: the Board files for 10-26 and 11-12-2026 could not be opened and were not read
- Still to read
- BOS work session action agenda of 10-26-2026 (not retrieved)
- Confidence in this reading
- Medium. The position is established but one element is unresolved: the adopting ordinance, the scope, how current the text is, or the type of source.
- Source as read
- Municode Supp. 26 Update 1, thru O-08-26 (6-8-2026). Read Nov. 4, 2026.
By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.
Coming up
- Joint work session of the Board of Supervisors and Planning Commission. Source: Entitlement Route Register, New Kent Co. row. Last checked Nov. 4, 2026.
Who is building here: the public record
No data center site appears for New Kent County in the free state and federal records searched. The records below are placed in this locality but name no data center site, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.
Between the Bridges Mitigation Bank, RIC4, RIC5 1 record
- Construction stormwater permit VAR10X977 · Between the Bridges Mitigation Bank, RIC4, RIC5 · Clearwater Mitigation III LLC
Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.
What to read
- Report: Who Showed Up. A census of the organizations around data center siting in Virginia, 2014 to 2026.
- Case study: Goochland County case study. The county's technology overlay district and the lawsuit over it.
This page covers only what these sources contain. A locality with little here may still have data center activity.