Approval

How a data center gets approved here

No approval routeThe use is unlisted and prohibited, or no route permits it.

The county's zoning chapter has no data center use, and uses not specifically listed are prohibited, so there is no route under the ordinance as it stands. The nearest lines, including warehousing and distribution and general office, do not name the use, and no county statement applying one of them to a data center was found in the results opened from the meeting portal's full-text searches; Board packets as whole files were not opened and the scanned Planning Commission minutes were not read.

A technology uses amendment, Ordinance 09-26, is pending. The Planning Commission recommended approval on March 3, 2026, and on April 13, 2026 the Board tabled it until further notice on a roll call of five ayes. The draft of March 3, 2026 would allow data centers by right on parcels fronting Rt. 360 or Rt. 30 or in any industrially zoned district. It would require a conditional use permit elsewhere, within 500 feet of a residentially sensitive property, or above 750,000 square feet of total building area, and it would prohibit them in designated historic districts. A draft is not law, and later drafts were not read.

The Board held a joint work session on the current draft on June 22, 2026. According to draft minutes of Oct. 26, 2026, a county work plan update proposed that the technology ordinance be included in the comprehensive plan update. The item is not on the Nov. 16, 2026 agenda.

State site assessment
Does not arise. No approval route currently exists.
The register entry this is drawn from, in the dataset's own shorthand
Position
UNLISTED = PROHIBITED (no data center use in the use matrix; a text amendment to add one was tabled by the Board on 4-13-2026)
Where
n/a today. Draft dated 3.3.26, as it went to the Board on 4-13-2026 (later drafts not read): by right on parcels with direct frontage along Rt. 360 or Rt. 30 or in any industrially zoned district; conditional use permit elsewhere, within five hundred (500) feet of a residentially sensitive property, or above 750,000 square feet of total building area; prohibited within designated historic districts
What the ordinance calls the use
(none in the code as read; the pending draft 'Division 7. Technology Uses' defines 'Data Center')
Provision
County Code Ch. 86 (county text 'Rev: 2/9/2026') Sec. 86-11(5); Sec. 86-140(a) to (c) and use matrix; Sec. 86-90
If the use is not listed
DEFAULT PROHIBITION (Sec. 86-11(5): 'Unless the contrary is clear from the context of the lists or other regulations of this chapter, uses not specifically listed are prohibited'; Sec. 86-140(b)); no zoning administrator classification power found (pattern search of the 241-page text; the administration provisions not read line by line)
Adopted
Ch. 86: Ord. No. 09-21R2, 9-27-2021 (use matrix history note adds Ord. No. 08-22, 8-22-2022 and Ord. 13-24, 7-22-24; none read). Pending: Ordinance 09-26, Technology Uses, tabled 4-13-2026 on a roll call of five ayes
Changes and status
No data center, data processing, data storage or server term, and no technology overlay or technology district term, in Ch. 86 as posted by the county ('Rev: 2/9/2026', 241 pages, text on every page; 'industrial' 54 hits as control); 'technolog' has 8 hits (pp. 24, 36, 126, 158, 173), of which the one read is the Research and development definition (p. 24); 'computer' 1 hit, in the Office, general definition; use matrix read in full for use names. The nearest lines ('Warehousing and distribution', 'Communications service', 'Utility service, major', 'Research and development', 'Office, general') do not name the use, and no county statement applying one of them to a data center was found in the results opened from the meeting portal's full-text searches for 'data center', 'data centers' and 'technology uses' (all dates): the Technology Uses memoranda and draft, Board minutes of 4-13, 4-27, 6-22, 7-27, 8-24 and 9-28-2026, the 10-26-2026 draft minutes, the 11-16-2026 agenda and the 10-6-2026 Planning Commission papers; Board packets as whole files and the 2024 technology files were not opened, and the scanned Planning Commission minutes were not read. Pending: Ordinance 09-26, adding 'Division 7. Technology Uses', initiated by the Planning Commission; the Commission tabled it on February 3, 2026 and on March 3, 2026 recommended approval (staff memo: unanimous; the Commission's own minutes are scans, not read); Board public hearing 4-13-2026, 'Ordinance 09-26 is tabled until further notice'; joint work session 6-22-2026 on 'the current draft'; resident survey reported 7-27-2026 (506 responses); 10-26-2026 (draft minutes), county work plan update: a proposal 'that due to the comp plan update as required by statute, that the Technology Ordinance is included and thereby extending the previous competition date' (as printed; the speaker's title is not on the pages read); not on the 11-16-2026 agenda. The draft dated 3.3.26: technology uses, including data centers, by right on parcels fronting Rt. 360 or Rt. 30 (minimum ten (10) acres) or in any industrially zoned district; conditional use permit elsewhere, within five hundred (500) feet of a residentially sensitive property, or above 750,000 square feet of total building area; height limit eighty (80) feet; no megawatt figure on the draft pages read. A draft is not law. Municode not opened; no list of Ch. 86 amendments adopted after 2-9-2026 was read (the portal searches return none naming data centers or technology uses). The 3-9-2026 'Exempt Lot Amendment' and an ordinance approved on 4-13-2026 before the Technology Uses item were not read; four zoning text amendments, one to the Sec. 86-140 use matrix on outdoor storage, are set for hearing on 11-16-2026 (scheduled, not held). Site plan: Sec. 86-404(c) and (d) read (Board approves a preliminary site plan for a conditional use, zoning administrator the final plan); the approver for a by-right use was not read
Still to read
drafts of Ordinance 09-26 later than 3.3.26 (not read)
Confidence in this reading
Medium. The position is established but one element is unresolved: the adopting ordinance, the scope, how current the text is, or the type of source.
Source as read
County's own posted text of Ch. 86, page header 'Rev: 2/9/2026' (Document Center file 'UPDATED Chapter_86___ZONING_AND_SUBDIVISION---2926'); Municode not opened. Read Nov. 14, 2026.

By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.