Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.
Data centers in Chesterfield County, Virginia
What the public record holds for this locality: how a data center gets approved, who is building, and what to read.
Case study: Chesterfield County, read from local packets, minutes, ordinances and agreements.
Approval Who is building What to read
How a data center gets approved here
A data center is a conditional use in the EC and EG districts only. It is not permitted in the other 12 districts in the use table. The rule took effect Jan. 1, 2026 under an ordinance adopted Sept. 17, 2025.
Under the old zoning chapter the use was by right in I-2 and C-5. The new ordinance expressly carves data centers out of its transition grandfathering. A later amendment effective Aug. 26, 2026 left the data center row unchanged as read on Nov. 4, 2026.
- State site assessment
- Triggered. Approval here generates a rezoning, special exception or special use permit.
The register entry this is drawn from, in the dataset's own shorthand
- Position
- CONDITIONAL USE
- Where
- EC, EG only (C); not permitted (blank) in the other 12 districts of Table 19.2-29.1
- What the ordinance calls the use
- Data Center
- Provision
- Ch.19.2 §19.2-29, Table 19.2-29.1
- If the use is not listed
- CONDITIONAL USE PERMIT route on Planning Director similarity finding, else not permitted (Sec. 19.2-28.E)
- Adopted
- Ord. 2025-18, 9-17-2025, eff. 1-1-2026
- Changes and status
- Was by right in I-2 and C-5 under superseded Ch.19.1. Expressly carved out of transition grandfathering. ZO-2026-003 (eff. 8-26-2026) amended Sec. 19.2-29; data center row unchanged as read 11-4-2026
- Route before the change
- By right
- Date of the change
- 2025-09-17
- Still to read
- Board minutes of 9-17-2025 adopting Ord. 2025-18 (not read)
- Confidence in this reading
- Medium. The position is established but one element is unresolved: the adopting ordinance, the scope, how current the text is, or the type of source.
- Source as read
- Amendment History Table through SO-2026-002, eff. 10-28-2026 (no codified-through line printed). Read Nov. 4, 2026.
By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.
Who is building here: the public record
6 data center sites in the permit record for Chesterfield County, grouped by site only where the records themselves link them, so one campus can appear as more than one site.
Data center sites found in the free state and federal records searched for Chesterfield County, and utility filings placed in the same locality, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.
Digital Drive Data Center campus 4 records
- Construction stormwater permit VAR10W293 · Digital Drive Campus (aka Digital Drive Data Center) · DPR Construction, Inc.
- Construction stormwater permit VAR10X812 · Digital Drive Data Center-Trailer City · DPR Construction, Inc.
- Construction stormwater permit VAR10V219 · Project Graph (Chirisa DD Campus) · DD Owner LLC
- Permit filing, VDOT Land Development 25PR1335 · Digital Drive Data Center SSP1
Google, Project Loch 3 records
- Permit filing, DEQ VWPP 26-0171 · Project Loch · Google LLC
- Public notice (wetlands and streams) NAO-2026-00182 · NAO-2026-00182 / VMRC# (Project Loch, Chesterfield County, Virginia) (Wauford PRM Site, Cumberland County, Virginia)
- Public notice (wetlands and streams) NAO-2026-00182 · NAO-2026-00182 / VMRC#26-0171 (Project Loch, Chesterfield County, VA)
Chirisa, 1401 Meadowville Technology Parkway 2 records
Google, Project Skye 2 records
- Permit filing, DEQ VWPP 26-0360 · Project Skye Site · Google LLC
- Public notice (wetlands and streams) NAO-2026-00282 · NAO-2026-00282 / VMRC# 26-0360 (Project Skye Data Center, Chesterfield County, Virginia)
CTP-03 Data Center - Phase 2 1 record
- Permit filing, VDOT Land Development 25PR1203 · CTP-03 Data Center - Phase 2
Westerleigh Extension Phase 3 1 record
- Permit filing, DEQ VWPP WP3-26-1568 · Westerleigh Extension Phase 3 · Google LLC
County-wide records
Filings that name no site, state grants, and State Corporation Commission cases placed in this locality.
- SCC case PUR-2018-00075 · Virginia Electric and Power Company - Application for approval and certification of electric transmission facilities: Chesterfield - Hopewell Lines #211 and #228 230 kV transmission line partial rebuild · VIRGINIA ELECTRIC AND POWER CO
- SCC case PUR-2025-00154 · Virginia Electric and Power Company - For Approval and Certification of Electric Transmission Facilities: Chesterfield-Lanexa Corridor Lines #92, #I92, #217, #287, and #2129 Partial Rebuild · VIRGINIA ELECTRIC AND POWER CO
- SCC case PUR-2020-00239 · Virginia Electric and Power Company - For approval and certification of electric transmission facilities: Allied-Chesterfield 230 kV Transmission Line #2049 Partial Rebuild Project · VIRGINIA ELECTRIC AND POWER CO
- SCC case PUR-2018-00082 · Virginia Electric and Power Company - For approval and certification of electric transmission facilities: Chesterfield-Lakeside Line #217 230 kV Transmission Line Rebuild · VIRGINIA ELECTRIC AND POWER CO
- SCC case PUR-2020-00014 · Virginia Electric and Power Company - For approval and certification of electric transmission facilities: Chesterfield-Tyler 230 kV Transmission Lines # 205 and #2003 Partial Rebuild Project · VIRGINIA ELECTRIC AND POWER CO
- SCC case PUR-2023-00054 · Virginia Electric and Power Company for Approval and Certification of Electric Transmission Facilities: Chesterfield-Hopewell Lines #211 and #228 Partial Rebuild Project · VIRGINIA ELECTRIC AND POWER CO
Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.
What to read
- Case study: Chesterfield County. Chesterfield built its data-center strategy on a single number: the equipment tax rate set at $0.24/$100 in April 2019 — a deliberate undercut of Henrico's $0.40 and the lowest in Virginia. Google assembled roughly 1,640 acres, Chirisa committed $2 billion, and Commonwealth Fusion Systems selected Battery Brooke for the world's first grid-scale commercial fusion plant. The rate is locked for thirty years.
- Report: Who Showed Up. A census of the organizations around data center siting in Virginia, 2014 to 2026.
- Book: Governing the Demand Shock. A comparison of how Virginia localities handled the arrival of data centers.
- Report: When the Operator Builds the Plant. Documents the June 30, 2025 Google–CFS power purchase agreement and Eni's September 22, 2025 offtake for the 400-megawatt ARC fusion plant in Chesterfield County — the Fall Line Fusion Power Station. Not a technology profile; examines the commercial instruments themselves and the equity stakes both buyers hold in the developer.
This page covers only what these sources contain. A locality with little here may still have data center activity.