Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.
Data centers in Caroline County, Virginia
What the public record holds for this locality: how a data center gets approved, who is building, and what to read.
Case study: Fredericksburg Ring, read from local packets, minutes, ordinances and agreements.
Approval Who is building What to read
How a data center gets approved here
A data center is allowed by right only inside a PIRT district, which requires at least 75 acres and has to be reached by rezoning. The county adopted that route in October and November 2023.
Data centers were also by right in M-1 from Nov. 16, 2023. The county repealed that on Dec. 10, 2024 and re-listed the use as a special exception.
- State site assessment
- Triggered on the rezoning. The district must be reached by map amendment.
The register entry this is drawn from, in the dataset's own shorthand
- Position
- BY RIGHT once inside PIRT; REZONING to reach
- Where
- PIRT (>=75 ac)
- What the ordinance calls the use
- Data Centers
- Provision
- Art.XI Div.7 §2.A; gateway Art.XI Div.1 §1
- If the use is not listed
- Not read
- Adopted
- TXT-10-2023, Oct/Nov 2023
- Changes and status
- M-1 by right (11-16-2023) REPEALED 12-10-2024, re-listed as Special Exception
- Route before the change
- By right
- Date of the change
- 2024-12-10
- Still to read
- Board minutes of 12-10-2024 repealing M-1 by right (not read)
- Confidence in this reading
- Medium. The position is established but one element is unresolved: the adopting ordinance, the scope, how current the text is, or the type of source.
- Source as read
- Art. X and Art. XI PDFs: 'As amended through June 29, 2026'. Read Nov. 4, 2026.
By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.
Who is building here: the public record
3 data center sites in the permit record for Caroline County, grouped by site only where the records themselves link them, so one campus can appear as more than one site.
Data center sites found in the free state and federal records searched for Caroline County, and utility filings placed in the same locality, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.
Mattameade Technology Campus 4 records
- Construction stormwater permit VAR10V314 · Mattameade Technology Campus · The Whiting-Turner Contracting Company
- Construction stormwater permit VAR10V760 · Mattameade Technology Campus Infrastructure Plan · The Whiting-Turner Contracting Company
- Public notice (wetlands and streams) NAO-2024-01108 · NAO-2024-01108 (Mattameade Data Center, Caroline County, Virginia)
- Permit filing, DEQ Stormwater Plan Review 2026-0006 · Mattameade Technology Campus · Amazon Data Services, Inc.
Carmel Church Data Center 1 record
- Construction stormwater permit VAR10W072 · Carmel Church Data Center · ADP Carmel Church Data Hub LLC
IAD-457 1 record
- Permit filing, DEQ Air Permits 74325-2 · IAD-457 · Amazon Data Services, Inc.
Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.
What to read
- Case study: Fredericksburg Ring. Between 2022 and June 12, 2026, the five jurisdictions surrounding the Rappahannock River fall line (Spotsylvania, Stafford, Caroline, and King George counties, and the independent City of…
- Report: Who Showed Up. A census of the organizations around data center siting in Virginia, 2014 to 2026.
- Report: Two Systems, One Drought. Virginia's coastal aquifer is capacity-bound; its river system is drought-stressed. The Commonwealth is solving a problem in one by adding to the other, and the data-center buildout is arriving before that trade has been priced.
- Report: A Line Drawn on a Highway. A study of Virginia's groundwater and river withdrawal rules and the data center water use they do not reach.
- Book: Governing the Demand Shock. A comparison of how Virginia localities handled the arrival of data centers.
This page covers only what these sources contain. A locality with little here may still have data center activity.