Tommy N. Turner

Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.

Portrait of Tommy N. Turner
Data Center LedgerFilings, minutes, orders and transcripts, logged as they are readLatest, Nov. 25: new report version →

Data Centers · By locality

Data centers in Botetourt County, Virginia

What the public record holds for this locality: how a data center gets approved, who is building, and what to read.

Case study: Botetourt County, read from local packets, minutes, ordinances and agreements.

Approval Who is building What to read

How a data center gets approved here

By rightThe ordinance names the use and permits it by right.

A data center is allowed by right in the RAM district (§ 25-392), and Greenfield is the only RAM park. The use lists of other districts were not read.

The use was added to § 25-392 by the Board's action of Nov. 26, 2024, a text amendment adopted 5-0 at a joint meeting of the Planning Commission and Board. The date comes from the codifier's history note; the signed resolution was not read. No earlier listing was found in the documents cited. The use was added while the county was under contract, with an option signed Oct. 1, 2024.

State site assessment
Not triggered on at least one route. A data center can be approved here, in at least one district or set of parcels, with no rezoning, special exception or special use permit. Other routes in the same locality may require one.
The register entry this is drawn from, in the dataset's own shorthand
Position
BY RIGHT
Where
RAM (§ 25-392; other districts' use lists not read; Greenfield is sole RAM park)
What the ordinance calls the use
Data center
Provision
§25-392(13)
If the use is not listed
Not read
Adopted
Text amendment 11-26-2024, joint PC/BOS 5-0
Changes and status
Use added to § 25-392 by the Board's 11-26-2024 action (codifier history note 'Res. of 11-26-24'; signed resolution not read); no earlier listing found in the documents cited. Added while county under contract (option signed 10-1-2024)
Route before the change
not addressed
Date of the change
2024-11-26
Still to read
Board resolution of 11-26-2024 adding data centers to § 25-392 (signed copy not read)
Confidence in this reading
Medium. The position is established but one element is unresolved: the adopting ordinance, the scope, how current the text is, or the type of source.
Source as read
Municode Supp. 76, codified through Ordinance of 10-28-2025 (online content updated 7-31-2026); county agendas and packets swept 7-28 to 10-27-2026. Read Nov. 4, 2026.

By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.

Who is building here: the public record

3 data center sites in the permit record for Botetourt County, grouped by site only where the records themselves link them, so one campus can appear as more than one site.

Data center sites found in the free state and federal records searched for Botetourt County, and utility filings placed in the same locality, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.

Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.

What to read

This page covers only what these sources contain. A locality with little here may still have data center activity.