Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.
Data centers in Appomattox County, Virginia
What the public record holds for this locality: how a data center gets approved, who is building, and what to read.
Approval Who is building What to read
How a data center gets approved here
A data center is allowed by right in M-1 and IP and is a conditional use in B-1 and V-1. The route runs through a definition: the ordinance defines "data center" and tags it to the "Industrial Manufacturing" land use category. No district use list in Division 7 names data centers in the current text, read Nov. 4, 2026; earlier versions were not read.
The definitions section was amended July 6, 2015, March 29, 2016, Oct. 19, 2020, Oct. 17, 2022 and July 21, 2025. Which amendment added the data center definition was not found. The online disposition list begins Nov. 18, 2024, and Board minutes for those dates were not found on the county's Agenda Center.
- State site assessment
- Not triggered on at least one route. A data center can be approved here, in at least one district or set of parcels, with no rezoning, special exception or special use permit. Other routes in the same locality may require one.
The register entry this is drawn from, in the dataset's own shorthand
- Position
- BY RIGHT via definitional tag
- Where
- M-1, IP by right; B-1, V-1 conditional
- What the ordinance calls the use
- DATA CENTER tagged '(Land Use Category: Industrial Manufacturing)'
- Provision
- def §19.6-12; use lists §§19.6-73,74; closed-list §19.6-22 (subject to ZA interpretive powers)
- If the use is not listed
- CLOSED LIST subject to ZA interpretive powers (Secs. 19.6-22, 19.6-23)
- Adopted
- §19.6-12 amended 7-6-2015, 3-29-2016, 10-19-2020, 10-17-2022 and 7-21-2025; which added the DATA CENTER definition not found (eCode360 Disposition List begins 11-18-2024; Board minutes for those dates not found on the county Agenda Center)
- Changes and status
- No district use list in Division 7 names data centers ('data cent' 0 hits, eCode360 text read 11-4-2026; earlier versions not read)
- Still to read
- Board minutes of the amendment that added the DATA CENTER definition to §19.6-12 (one of five dates 2015 to 2025; not found)
- Confidence in this reading
- Medium. The position is established but one element is unresolved: the adopting ordinance, the scope, how current the text is, or the type of source.
- Source as read
- eCode360 "Code 2026-06-15" (Disposition List last entry 6-15-2026; "New Laws (0)"). Read Nov. 4, 2026.
By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.
Who is building here: the public record
1 data center site in the permit record for Appomattox County, grouped by site only where the records themselves link them, so one campus can appear as more than one site.
Data center sites found in the free state and federal records searched for Appomattox County, and utility filings placed in the same locality, current through Nov. 22, 2026. Records are grouped under one site only where their own text links them: a site code, street address, project or campus name, notice number or named company. A record with no such link is listed on its own. Names are as each record prints them. A site missing here may still be planned: these sources miss projects that have no permit yet and code names no record ties to a company. From the dataset Who Is Building It: Virginia Data Center Sites in the Public Permit Record, which has every record, the grouping rules and what the sources do not show.
ADP Appomattox Data Hub LLC 1 record
- Permit filing, DEQ Air Permits 21814-1 · ADP Appomattox Data Hub LLC · ADP Appomattox Data Hub LLC
Sources: DEQ's active construction stormwater list, EPA ECHO (water and air), Virginia Permit Transparency, Corps of Engineers Norfolk District public notices, State Corporation Commission dockets and VEDP incentive reports.
What to read
- Report: Who Showed Up. A census of the organizations around data center siting in Virginia, 2014 to 2026.
This page covers only what these sources contain. A locality with little here may still have data center activity.