Tommy N. Turner

Virginia data center researcher: how each of 133 counties and cities approves one, and who pays for the grid. Independent, and updated as the record changes.

Portrait of Tommy N. Turner
Data Center LedgerFilings, minutes, orders and transcripts, logged as they are readLatest, Nov. 25: new report version →

Data Centers · By locality

Data centers in Albemarle County, Virginia

What the public record holds for this locality: how a data center gets approved.

Approval

How a data center gets approved here

By rightThe ordinance names the use and permits it by right.

A data center is allowed by right in the LI, HI and PD-IP industrial districts up to 40,000 square feet of gross floor area per lot. Above that size it needs a special use permit. In C-1, CO, HC and the Downtown Crozet District it needs a special use permit at any size. The rules require public water and sewer, a 200-foot setback from lot lines and 500 feet from the Rural Areas district.

The Board of Supervisors adopted these rules 6-0 on April 2, 2025 (Ord. 25-18(1)), after a 6-0 Planning Commission recommendation on Feb. 25, 2025. Before that, the county staff report says, data centers of any size were by right in the industrial districts. A second phase with a data center overlay district was paused indefinitely on Oct. 1, 2025, according to the county's project page. A zoning modernization draft, tabled at the Board, is not law.

One later Chapter 18 ordinance, Ord. 26-18(1) of June 17, 2026, was not read, and its subject is not known.

State site assessment
Not triggered for projects up to a stated size cap, which can be approved with no rezoning, special exception or special use permit. Above the cap, one is required.
The register entry this is drawn from, in the dataset's own shorthand
Position
BY RIGHT up to 40,000 sq ft aggregate gross floor area per lot in the industrial districts; SPECIAL USE PERMIT above that size and, at any size, in the commercial districts
Where
LI, HI, PD-IP Cat. 1, PD-IP Cat. 2: BR at or under 40,000 sq ft per lot, SP above (Sec. 26.2 table read cell by cell, four values per row). SP at any size in C-1, CO (C-1 and CO list headings not read; districts assigned by position), HC and the Downtown Crozet District (read from adopted Ord. 25-18(1); codified commercial sections not re-read, Municode refused the pages). No 'data cent' or 'data proc' string in Sections 10, 11, 12, 13, 14, 15, 16, 17 and 20 (term count on each section page, Municode version Nov 5, 2026). Sections 18, 19, 20A, 20C, 21, 25 PD-SC, 25A PD-MC, 27, 28, 29, 30 not read
What the ordinance calls the use
Data centers with an aggregate gross floor area not exceeding 40,000 square feet per lot / greater than 40,000 square feet per lot; 'Data center' defined Sec. 3.1
Provision
Ch. 18 Sec. 26.2(a) use table; supplementary regs Sec. 5.1.65; def Sec. 3.1; SUP lists as adopted in Ord. 25-18(1): Downtown Crozet District subsection E item 20, C-1 item 17, CO item 19, HC Sec. 24.2.2 item 19
If the use is not listed
Sec. 4.8.1 'Determinations concerning unspecified uses' (uses other than those specified may be added to a district on an owner's application if the commission and board of supervisors make two findings, by ordinance amendment under section 33); rule not reached (use named)
Adopted
Ord. 25-18(1), adopted 4-2-2025, 6-0 (BOS Actions and minutes of 4-2-2025); PC recommended approval 6:0 on 2-25-2025
Changes and status
Before Ord. 25-18(1) (staff report, Att.A of Board file 25-192): data centers 'of any size by right' in LI, HI and PD-IP, and by right up to 4,000 sq ft and by special exception over that size in HC, PD-SC and PD-MC. Phase 2 (text and map amendments with a Data Center Overlay District; resolutions of intent, Legistar files created 4-22-2025) NOT adopted: county project page says that on 10-1-2025 the Board 'agreed, to indefinitely pause' it; BOS Actions 10-1-2025 record the presentation 'Received', no vote. Legistar searches 'data center' and 'data centers' (all years, run 11-14-2026) show no data center ordinance after Ord. 25-18(1), by file title; the 2025 Phase 2 files were not opened. Zoning Modernization draft Article 6 use tables dated 30 July 2026 (file 26-346, on the Board's 8-19-2026 agenda, file type 'Report', status 'Tabled', history 'held') list 'Data centers, major' SP and 'Data centers, minor' P or SP: a draft, not law. Sec. 5.1.65: public water and sewer required; 200 ft setback from lot lines, 500 ft from the Rural Areas district; accessory data centers allowed up to 25% of the primary use's gross floor area. No megawatt figure in Secs. 5.1.65 or 26.2 as read. Site plan: the director of community development, as the board of supervisors' agent, acts on initial and final site plans (Secs. 32.3.1, 32.4.2.5, 32.4.3.6); the exceptions and appeal sections of Section 32 were not read
Route before the change
By right
Date of the change
2025-04-02
Still to read
Ord. 26-18(1) of 6-17-2026, the last Chapter 18 entry in the Supplement History Table (subject not read)
Confidence in this reading
High. Ordinance text read directly, citation verified, the position unambiguous.
Source as read
Municode 'VERSION: NOV 5, 2026 (CURRENT)'; Supplement History Table through 'Supp. No. 6, Update 3' (Ords. 26-15(1) and 26-15(2), 10-21-2026); last Chapter 18 entry 26-18(1), 6-17-2026 (subject not read). Read Nov. 14, 2026.

By right means the ordinance permits the use with no rezoning and no special permit. The state site assessment is the one in Va. Code § 15.2-2209.5. It applies to a new facility expected to need 100 megawatts or more when the approval is a rezoning, special exception or special use permit. This is a dated reading, current through Nov. 19, 2026. Ordinances change; read the cited provision before relying on it. From the dataset Virginia Data Center Entitlement Route Register, version 1.1, a record of how each of Virginia's 133 counties and independent cities, and five of its towns, approve a data center.

This page covers only what these sources contain. A locality with little here may still have data center activity.